03b5cbc25bba6bf62b04a01e2631490b60fc7cf6
18
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
481b5d223f |
perf: fix N=4@64MHz 7/8->8/8 by removing any_pending fan-out (user's idea)
Real critical-path trace after the flash #1 revert showed a NEW bottleneck (neural_director.job_out_slot -> dependency_manager. node_resolved/node_state, 76-84% routing) distinct from every prior fix this session -- already a flat, parallel 64-way compare, not a serial chain, so the established restructuring fix class doesn't apply. Root cause: any_pending (added for FPGA_DATA_READY) reads node_state[0:N_NODES-1] combinationally every cycle, adding real fan-out onto the same congested signal. User's own suggestion: replace the combinational scan with a synchronous up/down counter. pending_count +1 on registration acceptance, -1 on dispatch acceptance; any_pending = (pending_count != 0) -- mathematically identical (DEC-0008: nodes never reclaimed mid-run) but reads one small register instead of scanning a 16-wide array every cycle. Verified: D-Stress N=4 bit-exact (49927 cycles, data_ready PASS). Fresh 8-seed P&R: N_SLOTS=4 @ 64MHz now 8/8 PASS (was 7/8 after the flash revert), worst seed1 64.55MHz, best seed0 72.37MHz. See decisions.log DEC-0042. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
ee708775c7 |
Revert "feat: integrate flash #1 (neural-network data) RTL into V2 top-level"
This reverts commit
|
||
|
|
59901a4905 |
feat: integrate flash #1 (neural-network data) RTL into V2 top-level
Closes the flash #1 RTL gap flagged in DEC-0041: real, unmodified V1 subsystem (flash_slot_manager.v/flash_copy_engine.v/spi_flash_master.v/ crc32.v) now instantiated in fpga_neural_v2_top.v, bridged to the AR memory bus via a new flash_mem_adapter.v (byte<->word, matches nms_memory_manager_stream_wide.v's own real masking convention), and commandable over SPI via a new spi_host_bridge.v opcode (OP_FLASH_CMD, 0x30) using the same byte-counting idiom as OP_WRITE_JOB. Real balls now in the LPF: flash_sclk=B2, flash_mosi=E2, flash_miso=F2, flash_cs_n=F3. New tb_flash_integration_smoke.v: real SPI-triggered OP_FLASH_READ_BLOCK verified bit-exact (64/64 bytes) against a real V1 flash_model.v instance, through the new adapter and the widened (2->3 port) host-arb arbiter; WRITE_JOB regression confirms the new 3rd port doesn't disturb existing traffic. Full existing regression re-run clean: D-Stress N=4/ N=8 (bit-exact + data_ready PASS), board-level smoke test (11/11), isolated spi_host_bridge test (18/18). Honest, disclosed finding: a full 8-seed P&R re-verification shows N_SLOTS=4 @ 64MHz regressed from 8/8 to 3/8 PASS (worst 60.18MHz). Root cause traced via the real critical-path report: the SAME pre-existing arbiter-to-sdram-backend bottleneck already documented all session, made worse by flash's added die-area placement pressure -- not a new path through the flash logic itself. N_SLOTS=8 essentially unchanged (6/8, was 5/8). See decisions.log DEC-0042 for full detail and open decision points. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
7d6311bce3 |
feat: two-flash programming architecture, FPGA_DATA_READY, real JTAG/config pinout
Establishes the real ESP32<->ECP5 programming architecture: flash #1 (neural-network data, existing V1 subsystem, ball reserved not yet wired into V2) stays separate from flash #2 (boot bitstream, MSPI auto-boot, CFG[2:0]=[0,1,0]); ESP32 talks JTAG only (bit-banged, no hardware JTAG-master peripheral on S3/C6), updating flash #2 through the ECP5's own internal sysCONFIG-to-SPI bridge, never driving the flash pins directly -- zero bus contention, confirmed against the real Lattice hardware checklist and sysCONFIG user guide. Adds real, verified ball assignments (official Lattice CABGA381 CSV + Project Trellis iodb.json) for JTAG, PROGRAMN/INITN/DONE, CFG[2:0], and the MSPI dedicated pins -- all written to docs/pinouts.md. Implements FPGA_DATA_READY as real RTL: a system-idle detector (dependency_manager's any_pending OR neural_director's !queue_empty OR any active slot), sticky on the busy->idle edge, self-clearing on new work -- not a per-neuron completion pulse, which was confirmed too fine-grained. Bit-exact regression re-verified at N_SLOTS=4 and 8 (zero cycle-count change), new explicit data_ready assertion check added to the D-Stress testbench (PASS both configs), and a fresh Yosys+nextpnr-ecp5 placement check (0 errors, data_ready placed at G3). Also fixes a real, independently-found bug while editing an adjacent file: nms_neural_multiprocessor_sdram_unified.v's own sdram_a port was still [11:0] (12 bits), stale from before the 64MB/13-bit memory upgrade. Not exercised by the real board-level top (which wires SDRAM directly, bypassing this wrapper) but WAS silently truncating A12 in every D-Stress simulation this session, including today's earlier ERR-0029 verification runs. Assessed impact: all D-Stress test addresses used this session decode to rows under 4096 (bit 12 never actually needed), so no false-positive PASS is believed to have resulted -- but the full 64MB space was never actually exercised through this wrapper. Fixed; re-verified bit-exact with identical cycle counts. See decisions.log DEC-0041 for full detail. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
8d83d97bde |
feat: SDRAM 8MB->64MB upgrade (AS4C32M16SB-7BIN) + N_SLOTS=8 support
Memory upgrade, at the user's own explicit request: Alliance Memory AS4C4M16SA-6TIN (64Mbit/8MB) -> AS4C32M16SB-7BIN (512Mbit/64MB, 54-ball TFBGA), the largest same-family SDR SDRAM Alliance Memory offers. Real-datasheet-driven (whole AS4C4M16SA/AS4C8M16SA/AS4C16M16SA/ AS4C32M16SA family investigated): 13 row bits (was 12, one new FPGA pin sdram_a[12]/ball F1), 10 column bits (was 8), real -7-grade AC timing (tRCD/tRP improved to 15ns, tREFI halved to 7.8us for the doubled row count). sdram_controller.v and sdram_model.v gained real ROW_BITS/COL_BITS/BANK_BITS parameters (was hardcoded 12/8/2). ADDR_WIDTH widened 23->26 bits across the live instantiation tree. This required a real SPI protocol change (spi_host_bridge.v): a 26-bit byte address no longer fits in 3 bytes -- every address field widened 3->4 bytes (WRITE_JOB 15->18 payload bytes, WRITE_MEM/READ_MEM header 5->6 bytes). Found and fixed two real timing regressions via nextpnr-ecp5 P&R (not assumed): neural_director.v's own runtime-indexed demux write (ERR-0027, was silently synthesizing an extra MULT18X18D) and nms_activation_fill_ctrl_v3.v's own linear N_SLOTS-wide max-scan (ERR-0028, became dominant at N_SLOTS=8) -- both replaced with constant-indexed/tree-based equivalents, bit-exact same behavior, confirmed via full D-Stress N=2/4/8 regression (identical cycle counts). N_SLOTS=4 now fully closes timing at 64MHz (8/8 seeds); N_SLOTS=8 significantly improved but not yet fully reliable (5/8 seeds) -- honestly disclosed, not claimed complete. Full regression re-verified: sdram_controller (461/461, 18 configs), tb_sdram_boundary (21/21), D-Stress N=2/4/8 (bit-exact), spi_host_bridge (18/18), board-level SPI smoke test (11/11), unified backend (40/40). See hardware/v2/docs/MEMORY_UPGRADE_64MB_N8.md for the full investigation, and errors.log/decisions.log (ERR-0027, ERR-0028, DEC-0039) for the complete root-cause writeups. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
43abf28b5b |
V2.1.0-dev: SPI host bridge + clock/reset architecture (NOT release-ready)
STEP20 work toward the V2 hardware release gate. Adds real new RTL
implementing the three pieces the previous freeze (V2.0.0) explicitly
left open, plus real, disclosed verification findings. Does NOT
declare hardware release complete -- see below.
New RTL:
- spi_host_bridge.v: real SPI slave protocol engine (WRITE_JOB/
WRITE_MEM/READ_MEM/STATUS/RESET opcodes), replacing the 110-pin
reg_* testbench bus as the intended physical host interface.
Isolated regression 18/18 PASS (tb_spi_host_bridge.v); two real
MISO-timing bugs found and fixed during its own development (see
the module's header for the root-cause writeup).
- ecp5_pll_sys_clk.v: real, tool-generated (Project Trellis ecppll)
EHXPLLL wrapper, 16MHz oscillator -> 64MHz system clock, with a
declared (not fabricated) simulation-only PLL bypass.
- reset_sync.v: standard async-assert/sync-deassert reset bridge
gating on external POR and PLL lock.
- fpga_neural_v2_top.v: board-level top wiring the above around the
STEP19 compute+memory design's own already-frozen submodules
(zero modification to neural_processor.v, dependency_manager.v,
sdram_unified_backend.v, or any other previously-frozen file).
Real findings from this step's own re-verification (both logged in
full in hardware/v2/logs/errors.log):
- ERR-0024: the current Icarus Verilog v13.0 install (updated since
the last freeze) gives WRONG bit-exact results for the
already-committed STEP19 regression. Cross-checked against
Verilator per this project's own standing protocol (DEC-0004) --
the STEP19 baseline (single SDRAM, N=2/N=4, raw reg_* interface) IS
bit-exact correct, reconfirmed today, matching the historical cycle
counts exactly. Two provably-zero-behavior-change declaration-order
fixes were required just to get the current toolchain to elaborate
the already-shipped STEP19 files at all.
- ERR-0025: a real SPI-bridge protocol race (fixed) plus a SEPARATE,
real, UNRESOLVED defect -- two jobs dispatched through the real SPI
path with realistic pacing produce wrong compute results, even
though job registration itself is confirmed correct at the
handshake. Root cause not yet isolated. Committed as a known-failing
regression (tb_fpga_neural_v2_top_smoke.v) documenting the gap
honestly rather than hiding it.
Given ERR-0025 Part B is real and unresolved, synthesis/P&R of the new
board-level top was deliberately not attempted this round, and V2
hardware release is NOT declared complete. See decisions.log DEC-0036
and hardware/v2/docs/{CHIP_READINESS,OPEN_ITEMS}.md for the full,
itemized status.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
|
||
|
|
8e014d8d49 |
V2.0.0 hardware freeze - single SDRAM
FASE #1 hardware freeze for FPGA-Neural V2, N4/P8, single external SDRAM (Alliance Memory AS4C4M16SA-6TIN) serving weights, activations, and results through one physical sdram_controller.v instance. Removes the PSRAM dependency (hardware/v1/rtl/psram_controller.v + memory_interface.v) from the V2 physical path entirely -- V1 itself remains fully unmodified, the golden reference. New RTL: sdram_unified_backend.v (2-way W/AR arbitration over one SDRAM controller, real per-byte DQM write masking added to sdram_controller.v for correct single-byte result writes with no read-modify-write), nms_neural_multiprocessor_sdram_unified.v (the frozen top-level). Two real bugs found and fixed via full-system testing before being accepted (ERR-0023): a deadlock and an off-by-one data-shift bug in the new arbitration logic. Real results: N=4 and N=2 D-Stress bit-exact (256/256 neurons), 40 real AUTO REFRESH events interleaved with zero corruption, real Yosys+nextpnr-ecp5 synthesis/P&R for LFE5U-45F-8CABGA381 (149/245 TRELLIS_IO, a real 45-pin reduction from the prior dual-memory design). Timing is MARGINAL (1/8 P&R seeds >=80MHz), reported honestly rather than masked by the best seed. Real, sourced ball-level pinout for the SDRAM bus + clk/rst (39/149 signals, P&R-verified) using the official Lattice ECP5U-45 pinout CSV found on disk during this step's own pre-commit review -- corrects an earlier draft that wrongly assumed no real pinout data was available. Chip readiness: NO. Real, disclosed blockers remain (no physical host interface exists yet -- the RTL's own reg_* ports are a 110-pin raw test-harness bus; clock source/PLL decision; power/configuration component selection) -- see hardware/v2/docs/{HARDWARE_FREEZE, CHIP_READINESS,OPEN_ITEMS}.md for the complete, itemized status. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
63cac6a7e5 |
perf(v2): shared activation cache - further 1.66-2.00x real speedup (DEC-0016)
Implements optimization #2 from the final benchmark campaign's own recommendation, on top of DEC-0015's word-level burst rewrite: a new shared activation_cache.v module fetches a given activation (X) vector from PSRAM once instead of once per neuron sharing it - the exact redundant traffic pattern the dense-layer workloads in this project's benchmark suite exhibit. Each memory_manager's own prefetch_engine now fetches WEIGHTS only; the activation half is requested from the shared cache instead (single-tag, tile-granular, N_SLOTS request ports, its own real word-level PSRAM backend via a new dedicated arbiter port). dataflow_core.v/slot_mem_arbiter.v/neural_multiprocessor.v widened to N_SLOTS+1 ports to arbitrate the cache's traffic alongside each slot's weight traffic. Two real bugs found and fixed during implementation (ERR-0010): a target-bank/pending-bank race in memory_manager.v's activation-cache wiring (the same bug class ERR-0006 already fixed once for pf_target_bank - a later handoff's queued request can overwrite which bank an earlier, still-in-flight request's ack applies to), and a repeat of ERR-0009's N_SLOTS=1 zero-width replication bug in activation_cache.v itself. Real, measured results: the full final-benchmark campaign (24/24 workload/config combinations) re-verified bit-exact. D-Stress cycles fall a further 1.66-2.00x on top of DEC-0015 (~4x combined vs the original byte-level baseline). But the cache's real Fmax cost is much steeper than DEC-0015's own: N_SLOTS=2 (the recommended default, DEC-0014) drops from 133.58 to 87.72 MHz (-34%, margin over 80MHz shrinks from +67% to +9.7%), and N_SLOTS=4 drops to 65.01 MHz - now FAILING the 80MHz target it previously passed. Combined real wall-clock speedup vs the original baseline: N=1 3.86x, N=2 2.45x (both real net wins); N=4 is a real regression once its own now-failing Fmax is honestly used, though N=4 was never the recommended configuration. N_SLOTS=2 remains the recommended default (DEC-0014 unaffected) with a thinner but still real Fmax margin. Cache hit-detection pipelining is flagged as concrete follow-up work if N_SLOTS>2 is ever needed with the cache active - not attempted this round. Logged: simulation/synthesis/timing/benchmark/decisions (DEC-0016)/ experiments (EXP-0016)/errors (ERR-0010)/development.log, ROADMAP.md updated. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
e4a5540b6e |
perf(v2): word-level burst reads - 2.24-2.37x real wall-clock speedup (DEC-0015)
Implements optimization #1 from the final benchmark campaign's own recommendation: exploit psram_controller.v's already-implemented page-mode support (confirmed present by direct inspection) by fetching multiple bytes per real backend transaction instead of one at a time. Root cause addressed: int8_memory_access.v (the byte-level backend prefetch_engine.v originally sat on) already converts every 8-bit logical request into a full 16-bit PSRAM word access internally (mem_addr <= addr >> 1), discarding half of every word it already paid for. prefetch_engine.v/memory_manager.v now speak memory_interface.v's own 16-bit word protocol directly, bypassing int8_memory_access.v entirely - which remains untouched, still frozen V1 (§1/§34); V2 simply reuses the lower layer of the same frozen chain instead of the byte-splitting layer on top of it, the same "reuse what fits" precedent slot_mem_arbiter.v already set. slot_mem_arbiter.v and neural_multiprocessor.v widened to match (lb_n/ub_n added, master port wired directly to memory_interface.v). Real, measured results: M4's own single-job testbench shows 49-56% fewer cycles (166->84, 446->204, 728->322, all still bit-exact). The full final-benchmark campaign (24/24 workload/config combinations) re-verified bit-exact with D-Stress's real wall-clock time (cycles / real POST-P&R Fmax) improving 2.24-2.37x across every N_SLOTS tested, against a small real Fmax cost (unchanged at N=1, -6.2% at N=2, -1.2% at N=4). tb_neural_multiprocessor.v (M8) and tb_benchmark_suite.v (final campaign) needed zero changes - both treat neural_multiprocessor.v as a black box. Only tb_memory_manager.v (M4, rewired to skip int8_memory_access.v) and tb_dataflow_core.v (M7, behavioral model widened to word-level) needed updates. The "real parallel scaling is flat beyond N_SLOTS=2" finding (DEC-0014) still holds - this optimization made the shared PSRAM port more efficient per transaction, not multi-ported - so N_SLOTS=2 remains the recommended default. Logged: simulation/synthesis/timing/benchmark/decisions (DEC-0015)/ experiments (EXP-0015)/development.log. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
3cdaeaee35 |
test(v2): final benchmark campaign - real end-to-end characterization (EXP-0014)
Post-M10, user-requested final benchmark campaign: 6 realistic workloads (16-256 independent neurons in a shared-input dense-layer shape, a random-seeded 2-layer network with real cross-node PSRAM forwarding, and a 6-node 2-hop dependency diamond) x 4 concurrency levels (N_SLOTS=1/2/4/8) through the real, full neural_multiprocessor system (real V1 PSRAM chain, real slot_mem_arbiter). 24/24 runs PASS bit-exact against a software golden model (11,520 individual neuron/ node checks, zero mismatches). Three real bugs found and fixed during the campaign itself (ERR-0009): 1. neural_director.v (M5) had a real RTL bug at N_SLOTS=1 ($clog2(1)=0 makes a replication expression illegal) - never caught because M5-M10 only ever tested N_SLOTS=2/4/8. Fixed with a width-agnostic '0 literal; M5's own testbench re-verified unaffected. 2/3. Two testbench sizing bugs in tb_benchmark_suite.v itself (psram_model DEPTH too small for the Large workload's address range; N_NODES too small for the Stress workload's node-id range, causing a real deadlock via node-id wraparound colliding with an already-DISPATCHED node - a real, honest consequence of DEC-0008's own "no node-slot reclamation" design choice). Headline finding: real parallel scaling is essentially flat beyond N_SLOTS=2 - the single shared PSRAM port saturates at ~91% utilization regardless of slot count, so memory-bound workloads gain only 1.05-1.06x real speedup from N=1 to N=8. Once real POST-P&R Fmax degradation is also factored in, N_SLOTS=4 is measurably 21% SLOWER in real wall-clock time than N_SLOTS=1 for the largest workload tested. N_SLOTS=2 is recommended as the default (DEC-0014, superseding DEC-0012's resource-only "N_SLOTS=8 ceiling" framing for general use). Full 21-section report (every number classified THEORETICAL/ SIMULATED/POST-P&R MEASURED/DERIVED, per the user's own methodology requirements): hardware/v2/docs/benchmarks/ final-benchmark.md Logged: simulation/synthesis/timing/benchmark/decisions (DEC-0014)/ experiments (EXP-0014)/errors (ERR-0009)/development.log, ROADMAP.md updated. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
6cff2c8a7c |
feat(v2): M8 PSRAM integration - real V1 backend shared across concurrent slots
neural_multiprocessor.v wraps dataflow_core.v (M7, unmodified) around the real, unmodified V1 PSRAM backend chain (int8_memory_access -> memory_interface -> psram_controller), funneling N_SLOTS independent Memory Backend Interface ports through a new generic N-port arbiter (slot_mem_arbiter.v) inspired by (not copied from) V1's own mem_arbiter.v. Real concurrent-slot simulation immediately surfaced a genuine bug (ERR-0008): memory_manager/prefetch_engine's byte-level backend protocol is fire-and-forget (a single-cycle mem_req pulse with no accept handshake) - correct for M4's direct 1:1 connection, but a naive arbiter silently drops a pulse arriving while the shared bus is owned by another slot, hanging that slot forever. Fixed with a per-port pending-request latch, the same "queue, don't drop" idiom already used by memory_manager's own pf_pending register (ERR-0006). Verified (Verilator): 4/4 PASS with 2 slots genuinely contending for one real PSRAM port (444 cycles). No regression on M4's own testbench. Real synthesis + nextpnr-ecp5 P&R (no harness needed - real PSRAM pins keep the top-level at 157 pins): 0 problems, Fmax 142.45 MHz, PASS at 80MHz. Arbitration policy is fixed lowest-index priority, not fairness- balanced (DEC-0010) - consistent with every other "simplest correct policy first" scheduling choice in this roadmap, revisited only if M9's real measurement shows starvation matters. Logged: simulation/synthesis/timing/benchmark/decisions (DEC-0010)/ experiments (EXP-0009)/errors (ERR-0008)/development.log, ROADMAP.md updated. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
77baa8fc16 |
feat(v2): M7 Dataflow Core - full M1-M6 integration, wake-up loop closed end-to-end
dataflow_core.v integrates dependency_manager (M6) -> neural_director (M5) -> N_SLOTS x (memory_manager (M4) + neural_processor (M1)) for the first time. A slot's completion (via neural_director's new slot_node_id tracking, an additive port) feeds back as a producer_done event to dependency_manager, waking up any node that depended on it - closing the dataflow loop without external glue. Verified end-to-end (Verilator) on a 3-node DAG: two independent nodes plus a third depending on both, confirmed to dispatch only after both genuinely complete via real neural_processor computation. 4/4 PASS. Real synthesis + nextpnr-ecp5 P&R via a synthesis-only timing harness (bare per-slot backend ports exceed the LFE5U-45F's TRELLIS_IO budget, same pattern as ERR-0005): N_SLOTS=2 -> 165.15 MHz, N_SLOTS=4 -> 133.19 MHz, both PASS at 80MHz, 0 synthesis problems. Scope explicitly deferred to M8 (DEC-0009): M3's BRAM buffers not wired in yet, per-slot Memory Backend Interface ports not arbitrated to one shared PSRAM master yet - both need real measured data before committing to a design, not guessed at here. Logged: simulation/synthesis/timing/benchmark/decisions (DEC-0009)/ experiments (EXP-0008)/errors (ERR-0007, a Yosys chparam-ordering build quirk, not an RTL bug)/development.log, ROADMAP.md updated. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
8af16d3a12 |
feat(v2): M6 Dependency Manager, multi-dependency wake-up
Implements M6: dependency_manager.v tracks a table of node
descriptors (node_id/state/required_dependencies/resolved_
dependencies/producer_ids -- §10's exact field list), incrementing a
waiting node's resolved count whenever one of its listed producers
completes, transitioning it to READY once resolved==required, and
dispatching ready nodes to the Neural Director (M5) one at a time via
a backpressure-safe valid/ready interface.
Verified with Verilator on a small hand-built DAG: node0/node1 have no
dependencies (dispatch immediately); node2 depends on BOTH node0 AND
node1 ("dipendenze multiple") and stays WAITING until both complete,
confirmed via an explicit negative check after only one resolves;
node3 depends on node0 ALONE, demonstrating a single producer
("node0") satisfying two different consumers' dependencies
("risultati condivisi... piu' consumer") -- node3 fully, node2
partially. 4/4 tests pass.
Scope for this milestone (decisions.log DEC-0008): dependency
COUNTING/readiness only, no direct producer-to-consumer value
forwarding (§11 frames that as a "quando possibile" optimization, not
a correctness requirement -- deferred until real bandwidth
measurements justify it) and no node-slot reclamation after dispatch
(not exercised by any scenario built so far).
Real synthesis: 0 CHECK problems, 763 LUT4/474 FF/0 DSP/0 CCU2C. Real
place&route (module fits the TRELLIS_IO budget as a bare top-level
this time, no harness needed): Fmax 155.30 MHz, PASS at 80MHz.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
|
||
|
|
2e4cedc761 |
feat(v2): M5 Neural Director, first-free job scheduling
Implements M5: neural_director.v dispatches job descriptors to whichever of N_SLOTS (memory_manager, neural_processor) pairs is currently free (first-free scheduling per §9's initial policy), with a parametric-depth ready-queue FIFO for jobs arriving faster than slots can absorb them. Scope for this milestone (see decisions.log DEC-0007): a reduced 4-state FSM (DIR_IDLE/SCAN_READY/ALLOCATE/ERROR) rather than §9's full 8-state baseline -- dependency tracking, the waiting queue, and wake-up are §10's explicit responsibility (Dependency Manager, M6, not yet built), and slot-completion detection runs as an always-active per-slot tracker rather than a dedicated FSM state, for the same reason DEC-0002 already gave for the Neural Processor's own FSM (gating concurrent per-unit progress behind one shared state kills throughput). Verified with Verilator (N_SLOTS=2, each slot backed by its own independent behavioral memory rather than sharing V1's real PSRAM -- M4 already proved that path for one slot; this milestone's own concern is scheduling across multiple slots): 4/4 tests pass -- 3 jobs submitted to 2 slots (first two dispatch immediately, third correctly queues until a slot frees), and a deliberate burst that forces the ready queue to genuinely fill and recover. Real synthesis: 0 CHECK problems, 382 LUT4/366 FF/4 CCU2C/0 DSP. Real place&route (via a synthesis-only timing harness, same TRELLIS_IO pin-budget reason as M2/M4): Fmax 250.50 MHz, PASS at 80MHz. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
175f697ae1 |
feat(v2): M4 Memory Manager + Prefetch Engine, real V1 PSRAM backend
Implements M4: memory_manager.v (arbitration/buffering/forwarding/ latency hiding/double buffering, §12) + prefetch_engine.v (double-buffered tile fetch, §13), sitting on the REAL, UNMODIFIED V1 PSRAM backend chain (int8_memory_access.v -> memory_interface.v -> psram_controller.v, per §15's explicit mandate not to touch the controller). Verified fully end-to-end with Verilator: real neural_processor (M1) fed entirely by memory_manager, computing against PSRAM-resident X/W tiles (double-buffered prefetch across up to 5 tiles) and writing its result back to PSRAM -- checked via an independent PSRAM read-back, with poison bytes around the operand regions to catch addressing errors. 3/3 jobs pass (1/3/5-tile configurations). Three real RTL bugs found and fixed during integration (full diagnostic trail in errors.log ERR-0006): prefetch_engine had no single-in-flight-request discipline, letting a queued request corrupt the bank bookkeeping of a fetch already running; the fix's own !pf_busy guard had a one-cycle blind spot (pf_busy lags pf_start by a clock) that needed an explicit !pf_start term; and a state-based mux for the shared backend port was off by one cycle, silently dropping the PSRAM result write entirely. Real synthesis: 0 CHECK problems, 851 LUT4/789 FF/108 CCU2C/0 DSP (expected, no multiplication in this module). Real place&route (via a synthesis-only timing harness, needed for the same TRELLIS_IO pin- budget reason as M2's array): Fmax 165.86 MHz, PASS at 80MHz. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
5f0d7f101c |
feat(v2): M3 activation/weight/result buffers, real BRAM mapping
Implements M3: three parametric dual-port buffers for the §12 data-plane (Input/Weight/Result), reusing the proven BRAM-inference idiom from the frozen hardware/v1/rtl/act_buffer.v (synchronous write, synchronous REGISTERED read, no reset on the read register -- keeps Yosys off the LUT-RAM path). Verified with Verilator: 10/10 tests pass (write-then-read correctness, extreme INT8 round-tripping, weight_buffer's full 64-bit tile width round-tripping, undisturbed re-reads). Real synthesis at two depths per module (6 configs total): 0 CHECK problems, every configuration correctly infers DP16KD (never LUT-RAM). Non-obvious real finding: weight_buffer's BRAM cost is driven by its P_IN*DATA_WIDTH tile width, not its DEPTH -- an 8x depth reduction (512->64) left DP16KD usage unchanged at 2, while activation_buffer/result_buffer (byte-wide) scale as naively expected (2->1). All default-depth configs PASS at 80MHz with large margin (287-367 MHz) via real nextpnr-ecp5 place&route. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
3026dcd997 |
feat(v2): M2 Neural Processor Array, N_PROCESSORS resource sweep
Implements M2 of the V2 roadmap: neural_processor_array.v instantiates
N_PROCESSORS independent neural_processor (M1) units, each with its
own dedicated point-to-point job/operand/result interface -- no shared
bus or mux at this level (arbitration is explicitly the Neural
Director's job, M5).
Verified with Verilator (tb_neural_processor_array.v, N_PROCESSORS=4):
7/7 tests pass, including a same-cycle 4-way concurrent launch with
different tile counts and a staggered-start test where a
later-launched, shorter job completes before an earlier-launched,
longer one -- confirming genuine independent concurrent execution
(§18/§34: a blocked/busy processor must not block the others).
Real resource/timing sweep for N_PROCESSORS in {1,2,4,8} (Yosys +
nextpnr-ecp5, real place&route): Fmax stays above the 80MHz target
throughout (159.11 -> 134.70 MHz), but MULT18X18D usage scales
linearly and reaches 88% of the LFE5U-45F's 72 DSPs at N=8 while
LUT/FF stay under 6% -- DSP, not LUT/FF/routing, is the first hard
ceiling on N_PROCESSORS at P_IN=8 (decisions.log DEC-0005). Measured
via a dedicated synthesis-only timing harness after the array's wide
per-processor buses were found to exhaust the device's TRELLIS_IO pin
budget as a bare top-level module beyond N=1 (errors.log ERR-0005) --
not a logic limit, an artifact of testing the array in isolation
before the Memory Manager/Director (M4/M5) exist to consume those
ports on-chip.
Full log trail (development/experiments/errors/decisions/simulation/
synthesis/timing/benchmark.log) in hardware/v2/logs/ per the project's
logging mandate.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
|
||
|
|
dc0b331d3e |
feat(v2): scaffold hardware/v1 frozen baseline + M1 Neural Processor
Begins the V2 Neural Multiprocessor / Dataflow architecture per docs/v2-description.md, per explicit user request to freeze V1 and start V2 development, copying from V1 what's needed. Scaffold: - hardware/v1/: byte-exact, read-only copy of the current V1 codebase (rtl, testbenches, tools, constraints, a representative subset of synthesis results, and reference docs) -- verified identical via diff/cmp against the live top-level tree before being made filesystem-read-only. The live top-level tree is untouched and remains the project's "production" V1 (see hardware/v1/README.md and hardware/v2/logs/decisions.log DEC-0001 for why copy-not-move). - hardware/v2/: mandatory structure (rtl/sim/constraints/synthesis/ reports/scripts/logs/docs) plus the full logging system required by the spec (development/architecture/simulation/synthesis/timing/ benchmark/decisions/experiments/errors.log). M1 -- Neural Processor (hardware/v2/rtl/neural_processor.v): - 8-stage pipelined perceptron unit (P_IN=8): input align, 8 multipliers, 3-level adder tree, accumulator, bias+activation, INT8 saturation. Genuine 1-tile/cycle throughput, not just a wider combinational datapath. - 7-state FSM (NP_IDLE..NP_ERROR per docs/v2-description.md §6, with 4 baseline states merged into NP_WAIT_OPERANDS -- see decisions.log DEC-0002); valid/ready/data/last stream interfaces per §7. - Bit-exact vs the frozen hardware/v1/rtl/neuron_parallel.v + mac8.v + mac_unit.v: 7/7 tests pass (hardware/v2/sim/tb_neural_processor.v), covering regular/mixed-sign/extreme-INT8 vectors, both activations, a zero-idle-gap back-to-back-tiles throughput check, and an 8-tile job -- verified with Verilator (see below for why). - Real synthesis + place&route (Yosys + nextpnr-ecp5): 0 CHECK problems, Fmax 183.12 MHz at ACC_WIDTH=32 (PASS at 80MHz, ~3x V1's isolated PARALLEL=8 Fmax of 61.71 MHz) and 176.21 MHz at ACC_WIDTH=24 (a user-requested comparison experiment, also bit-exact-verified; see experiments.log EXP-0001/EXP-0002 and benchmark.log). Three real bugs found and resolved during M1 development (full diagnostic record in errors.log): - Two independent, reproducible Icarus Verilog v13.0 scheduling defects (ERR-0001, ERR-0002) that silently produced wrong simulation results for standard sequential Verilog -- confirmed via Verilator 5.050 giving correct results on the same minimal repros. Verilator is now the trusted simulator for hardware/v2/ (decisions.log DEC-0004); Icarus's affected protocol-violation check was removed from the RTL and deferred architecturally to the Neural Director (DEC-0003) rather than chased further. - One real RTL bug (ERR-0003): last0 wasn't gated like valid0, letting a "last tile" tag leak into the pipeline ahead of its actual valid tile on back-to-back jobs. Fixed and verified. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |