Final milestone of docs/v2-description.md's §33 roadmap, scoped exactly to its own mandate: optimize only on data already gathered in M1-M9, across the pipeline/P_IN/processor-count/scheduling/memory axes - no speculative new features. Three concrete, data-driven results: 1. N_SLOTS=8 (numero processor axis): real synthesis + nextpnr-ecp5 P&R for dataflow_core at N_SLOTS=8, extending M7's N_SLOTS=2/4 sweep to the real DSP ceiling DEC-0005 predicted. 92.63 MHz POST-P&R, PASS at 80MHz, DSP 64/72 (88.9%). DEC-0012 recommends N_SLOTS=8 as the practical ceiling for P_IN=8 on the LFE5U-45F-8BG381. 2. ACC_WIDTH 24 vs 32 (pipeline axis): a real 6-seed nextpnr-ecp5 placement sweep (reusing already-synthesized netlists, no new synthesis needed) resolves EXP-0002's single-seed inconclusiveness. ACC_WIDTH=24 wins on both mean Fmax (+6.2%, 180.71 vs 170.12 MHz) and seed-to-seed variance (~3.4x tighter), on top of its already-known resource advantage. DEC-0013 recommends ACC_WIDTH=24 as the new default. 3. Stall %/utilization (scheduling/memory axes): testbench-only cycle counters added to tb_neural_multiprocessor.v (no RTL touched) close DEC-0011's deferred measurement gap with real data - shared PSRAM port 81.7% utilized, slot 0 95.2%, slot 1 65.2%, no conclusive evidence of harmful fixed-priority starvation at this scale. The 10-milestone V2 roadmap (docs/v2-description.md §33) is now complete end-to-end: real Verilator simulation, real Yosys synthesis, real nextpnr-ecp5 place & route for every milestone, fully logged (EXP-0001..EXP-0013, DEC-0001..DEC-0013, ERR-0001..ERR-0008) with no invented results (§30) and V1 kept frozen and untouched throughout (§1/§34). Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
Formato dei log V2
Regola non negoziabile (docs/v2-description.md §25-29): ogni attività
significativa (modifica, simulazione, sintesi, benchmark, decisione, errore)
deve essere registrata. Nessun log viene mai sovrascritto o troncato — solo
append. Nessun ID esperimento (EXP-XXXX) o decisione (DEC-XXXX) viene mai
riutilizzato, anche se il risultato è un FAIL.
File
development.log— log principale di sviluppo, un'entry per ogni sessione di lavoro/milestone (creazione file, refactor, avanzamento roadmap).architecture.log— decisioni e note di architettura a grana fine (non scelte finali — quelle vanno indecisions.log— ma esplorazioni, alternative considerate, vincoli scoperti).simulation.log— ogni run di simulazione (Icarus/Verilator): test, vettori, cicli, PASS/FAIL, confronto bit-exact con V1, stall/memory-wait.synthesis.log— ogni run Yosys: LUT/FF/DSP/BRAM, warning, problemi CHECK.timing.log— ogni run nextpnr-ecp5: Fmax, percorso critico, WNS/TNS se disponibili. Fmax "ufficiale" di una configurazione = solo da qui, mai da simulazione o stima.benchmark.log— tabelle di confronto per configurazione (Fmax, MAC/cycle, cycles/neuron, utilization, ecc.), sempre con etichetta THEORETICAL/SIMULATED/SYNTHESIZED/POST-P&R.decisions.log— decisioni architetturali importanti, formatoDEC-XXXX(vedidocs/v2-description.md§27).experiments.log— registro principale, unEXP-XXXXper ogni esperimento end-to-end (config → sim/synth/timing → risultato), rimanda areports/experiments/EXP-XXXX/.errors.log— errori/bug/regressioni incontrati durante lo sviluppo V2 stesso (non i bug V1, già chiusi inhardware/v1/docs/validation/bugs.md).
Campi minimi per entry (§26)
timestamp, experiment_id (se applicabile), git_commit, session/agent,
module, configuration, action, reason, command, result, errors, decision,
next_action
Per synthesis/timing aggiungere: LUT, FF, DSP, BRAM, Fmax, critical path, WNS/TNS. Per simulazione: test, vectors, cycles, PASS/FAIL, bit-exact result, stall cycles, memory wait, utilization.