dataflow_core.v integrates dependency_manager (M6) -> neural_director (M5) -> N_SLOTS x (memory_manager (M4) + neural_processor (M1)) for the first time. A slot's completion (via neural_director's new slot_node_id tracking, an additive port) feeds back as a producer_done event to dependency_manager, waking up any node that depended on it - closing the dataflow loop without external glue. Verified end-to-end (Verilator) on a 3-node DAG: two independent nodes plus a third depending on both, confirmed to dispatch only after both genuinely complete via real neural_processor computation. 4/4 PASS. Real synthesis + nextpnr-ecp5 P&R via a synthesis-only timing harness (bare per-slot backend ports exceed the LFE5U-45F's TRELLIS_IO budget, same pattern as ERR-0005): N_SLOTS=2 -> 165.15 MHz, N_SLOTS=4 -> 133.19 MHz, both PASS at 80MHz, 0 synthesis problems. Scope explicitly deferred to M8 (DEC-0009): M3's BRAM buffers not wired in yet, per-slot Memory Backend Interface ports not arbitrated to one shared PSRAM master yet - both need real measured data before committing to a design, not guessed at here. Logged: simulation/synthesis/timing/benchmark/decisions (DEC-0009)/ experiments (EXP-0008)/errors (ERR-0007, a Yosys chparam-ordering build quirk, not an RTL bug)/development.log, ROADMAP.md updated. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
209 lines
12 KiB
Plaintext
209 lines
12 KiB
Plaintext
# V2 development log — solo append, mai troncato/sovrascritto (vedi README.md)
|
|
|
|
[2026-09-05T11:14:08Z] commit=07a48e4 session=v2-kickoff
|
|
module: scaffold
|
|
action: creato hardware/v1/ (baseline V1 congelata, sola lettura) e
|
|
hardware/v2/ (struttura obbligatoria: rtl/ sim/ constraints/ synthesis/
|
|
reports/{simulation,synthesis,timing,experiments}/ scripts/sweep/ logs/
|
|
docs/), per iniziare lo sviluppo V2 richiesto da docs/v2-description.md.
|
|
reason: richiesta utente esplicita -- "Crea un v1 con tutto il codice
|
|
attuale che non deve essere modificato per nessun motivo e lavora su
|
|
una v2 copiando quello che ti serve. Aggiornami frequentemente e crea
|
|
un log nuovo."
|
|
command: cp rtl/*.v sim/*.v tools/ synth/ecp5/{p2,p4,p8,post_fix_verify}
|
|
synth/ecp5/*.lpf docs/validation/*.md WORKLOG.md
|
|
docs/FPGA-NeuralNetwork-Engine.md docs/FPGA-Neural-Datapatch-Benchmark.md
|
|
docs/FPGA-Neural-Hardware-Design.md -> hardware/v1/{rtl,sim,tools,
|
|
constraints,synthesis,docs}; chmod -R a-w su tutto hardware/v1/.
|
|
result: verificato bit-esatto (`diff -rq rtl/ hardware/v1/rtl/` e cmp
|
|
file-per-file su sim/*.v, 0 differenze). hardware/v1/ reso sola lettura
|
|
a livello filesystem come ulteriore salvaguardia oltre alla policy.
|
|
hardware/v2/ vuoto tranne logs/ (questo file + README.md).
|
|
errors: nessuno.
|
|
decision: copia (non spostamento) dell'albero top-level rtl/sim/synth/
|
|
tools -- l'albero principale del repository resta la "produzione" V1
|
|
invariata; hardware/v1/ e' una seconda copia frozen dedicata al
|
|
confronto V2, per minimizzare il rischio di rompere riferimenti/path
|
|
esistenti in WORKLOG.md, docs/, altri script. Vedi decisions.log
|
|
DEC-0001 per la motivazione completa.
|
|
next_action: M1 (docs/v2-description.md §33) -- implementare
|
|
hardware/v2/rtl/neural_processor.v (P_IN=8), pipeline 8 stage,
|
|
bit-exact contro hardware/v1/rtl/neuron_parallel.v + mac8.v,
|
|
testbench hardware/v2/sim/tb_neural_processor.v.
|
|
|
|
[2026-09-05T12:03:12Z] commit=07a48e4 session=v2-M1-neural-processor
|
|
module: hardware/v2/rtl/neural_processor.v + hardware/v2/sim/
|
|
tb_neural_processor.v
|
|
action: implementato M1 (docs/v2-description.md §33) -- Neural
|
|
Processor P_IN=8, pipeline a 8 stadi (input align -> 8 moltiplicatori
|
|
-> 3 livelli di albero di somma -> accumulatore -> bias/activation ->
|
|
saturazione INT8), FSM a 7 stati (§6, con 4 stati assorbiti in
|
|
NP_WAIT_OPERANDS per il vero throughput pipeline -- vedi
|
|
decisions.log DEC-0002), interfacce valid/ready/data/last (§7).
|
|
Aritmetica bit-esatta con hardware/v1/rtl/neuron_parallel.v +
|
|
mac8.v + mac_unit.v.
|
|
reason: roadmap M1, richiesta esplicita utente di iniziare lo sviluppo
|
|
V2 copiando da V1 quanto necessario.
|
|
result: 3 bug reali incontrati e risolti durante lo sviluppo (vedi
|
|
errors.log ERR-0001/0002/0003) -- due erano bug del toolchain Icarus
|
|
Verilog v13.0 (non del RTL), confermati installando e usando
|
|
Verilator 5.050 come secondo simulatore indipendente (decisions.log
|
|
DEC-0004); uno era un bug RTL reale (gating mancante su `last0`,
|
|
fix verificato). Testbench finale: 7/7 test PASS, bit-exact contro
|
|
V1, sia a ACC_WIDTH=32 che ACC_WIDTH=24 (esperimento richiesto
|
|
dall'utente, experiments.log EXP-0002). Sintesi reale Yosys + P&R
|
|
reale nextpnr-ecp5: 0 problemi CHECK, Fmax 183.12 MHz (ACC_WIDTH=32)
|
|
/ 176.21 MHz (ACC_WIDTH=24) -- entrambi PASS a 80MHz con ampio
|
|
margine, ~3x il Fmax isolato di V1 a PARALLEL=8 (61.71 MHz).
|
|
errors: vedi errors.log ERR-0001, ERR-0002, ERR-0003, ERR-0004.
|
|
decision: vedi decisions.log DEC-0002, DEC-0003, DEC-0004.
|
|
next_action: M2 -- neural_processor_array.v, sweep N_PROCESSORS
|
|
(1,2,4,8), misura timing/risorse/throughput/utilization reali.
|
|
|
|
[2026-09-05T14:30:00Z] commit=dc0b331 session=v2-M2-processor-array
|
|
module: hardware/v2/rtl/neural_processor_array.v + hardware/v2/sim/
|
|
tb_neural_processor_array.v + hardware/v2/synthesis/
|
|
harness_neural_processor_array.v
|
|
action: implementato M2 -- Neural Processor Array, N_PROCESSORS
|
|
parametrico, ogni processore con interfaccia job/operand/result
|
|
dedicata (nessun bus condiviso/mux a questo livello, §7). Testato
|
|
N_PROCESSORS=4 con esecuzione concorrente reale (lancio simultaneo
|
|
di 4 job diversi, più un test a partenza sfalsata) e con lo sweep
|
|
reale N_PROCESSORS={1,2,4,8} per sintesi/place&route.
|
|
reason: roadmap M2.
|
|
result: 7/7 test PASS (Verilator), confermata esecuzione concorrente e
|
|
indipendente (un job più corto lanciato dopo completa prima di uno
|
|
più lungo lanciato prima -- non c'e' serializzazione nascosta).
|
|
Sintesi/P&R reali per N=1/2/4/8: 0 problemi CHECK, scaling lineare
|
|
delle risorse, Fmax sempre PASS a 80MHz (159.11/149.59/151.01/134.70
|
|
MHz). Scoperta reale non assunta: il DSP (MULT18X18D) e' la prima
|
|
risorsa a saturare (88% a N=8), non LUT/FF (sotto il 6% anche a
|
|
N=8) -- vedi decisions.log DEC-0005.
|
|
errors: ERR-0005 (artefatto di sintesi da pin-count, non un bug RTL --
|
|
workaround con un harness dedicato, vedi errors.log). Un primo
|
|
tentativo di harness alimentava dati identici a ogni processore/lane
|
|
MAC, e Yosys deduplicava silenziosamente tutto a 1x indipendentemente
|
|
da N -- scoperto verificando che lo scaling fosse davvero lineare
|
|
prima di fidarsi dei numeri.
|
|
decision: vedi decisions.log DEC-0005.
|
|
next_action: M3 -- activation_buffer.v / weight_buffer.v /
|
|
result_buffer.v (profondita' parametrica, valutare BRAM mapping).
|
|
|
|
[2026-09-05T15:15:00Z] commit=3026dcd session=v2-M3-buffers
|
|
module: hardware/v2/rtl/activation_buffer.v, weight_buffer.v,
|
|
result_buffer.v
|
|
action: implementato M3 -- tre buffer paramentrici (profondita'
|
|
parametrica) che inferiscono DP16KD reale, riusando l'idioma gia'
|
|
validato in hardware/v1/rtl/act_buffer.v (porta A scrittura sync,
|
|
porta B lettura sync REGISTRATA, nessun reset sulla porta di lettura
|
|
per restare fuori dal percorso LUT-RAM).
|
|
reason: roadmap M3.
|
|
result: 10/10 test PASS (Verilator). Sintesi reale a 2 profondita'
|
|
ciascuno: 0 problemi CHECK, DP16KD reale confermato in tutte le 6
|
|
configurazioni (mai LUT-RAM). Scoperta reale non assunta: il costo
|
|
BRAM di weight_buffer e' determinato dalla LARGHEZZA (P_IN*DATA_
|
|
WIDTH=64 bit), non dalla profondita' -- 512->64 di profondita' non
|
|
ha ridotto il conteggio DP16KD (resta 2). Place&route reale sui
|
|
default: tutti PASS a 80MHz con ampio margine (287-367 MHz).
|
|
errors: nessuno.
|
|
decision: vedi benchmark.log -- il dimensionamento di weight_buffer
|
|
andra' guidato da P_IN, non solo da DEPTH, quando si arrivera' a
|
|
M4/M9.
|
|
next_action: M4 -- memory_manager.v + prefetch_engine.v.
|
|
|
|
[2026-09-05T16:00:00Z] commit=5f0d7f1 session=v2-M4-memory-manager
|
|
module: hardware/v2/rtl/memory_manager.v, prefetch_engine.v
|
|
action: implementato M4 -- Memory Manager (arbitraggio/buffering/
|
|
forwarding/gestione latenza/double buffering, §12) + Prefetch Engine
|
|
(fetch a doppio buffer con retargeting di una singola istanza per
|
|
banco, §13). Backend PSRAM V1 riusato SENZA MODIFICHE
|
|
(int8_memory_access.v -> memory_interface.v -> psram_controller.v,
|
|
§15), integrato end-to-end con un vero hardware/v2/rtl/
|
|
neural_processor.v (M1).
|
|
reason: roadmap M4.
|
|
result: 3/3 job PASS end-to-end (1/3/5 tile), risultato verificato con
|
|
RILETTURA INDIPENDENTE da PSRAM (non solo ispezione di segnali
|
|
interni), con byte "poison" attorno alle regioni operando per
|
|
catturare eventuali errori di indirizzamento off-by-one (nessuno
|
|
trovato). 3 bug RTL reali trovati e risolti durante l'integrazione
|
|
(vedi errors.log ERR-0006): mancava una disciplina "una sola
|
|
richiesta di prefetch in volo", un buco di un ciclo nel check
|
|
!pf_busy, un mux di stato disallineato di un ciclo che faceva
|
|
silenziosamente perdere la scrittura del risultato su PSRAM.
|
|
Sintesi reale: 0 problemi, 851 LUT4/789 FF/108 CCU2C/0 DSP (atteso).
|
|
Fmax reale (via harness, stesso motivo pin-count di ERR-0005):
|
|
165.86 MHz, PASS a 80MHz.
|
|
errors: vedi errors.log ERR-0005 (ricorrenza), ERR-0006 (3 bug nuovi).
|
|
decision: vedi decisions.log DEC-0006 (motore di prefetch singolo +
|
|
registro pendente, nessun arbitro backend ancora necessario).
|
|
next_action: M5 -- neural_director.v, scheduling first-free.
|
|
|
|
[2026-09-05T17:00:00Z] commit=175f697 session=v2-M5-neural-director
|
|
module: hardware/v2/rtl/neural_director.v
|
|
action: implementato M5 -- Neural Director, scheduling first-free
|
|
(§9) su N_SLOTS coppie (memory_manager, neural_processor). FSM
|
|
ridotta a 4 stati (DIR_IDLE/SCAN_READY/ALLOCATE/ERROR) -- dependency
|
|
tracking/wake-up rimandati al Dependency Manager (M6, non ancora
|
|
costruito), rilevamento completamenti gestito da un tracker
|
|
sempre-attivo per-slot (non uno stato dedicato da rivisitare).
|
|
reason: roadmap M5.
|
|
result: 4/4 test PASS (N_SLOTS=2) -- dispatch first-free confermato,
|
|
coda pronta con backpressure reale confermata (riempimento e
|
|
recupero), 3 job su 2 slot con il terzo correttamente in coda fino
|
|
a liberazione di uno slot. 2 bug di testbench trovati e risolti
|
|
(non RTL): DEPTH di sim_byte_mem troppo piccolo per il range di
|
|
indirizzi usato, e una condizione di attesa che si fermava al primo
|
|
job completato invece che a tutti e tre. Sintesi reale: 0 problemi,
|
|
382 LUT4/366 FF/4 CCU2C/0 DSP. Fmax reale (via harness): 250.50 MHz.
|
|
errors: nessun bug RTL, solo 2 bug di testbench (vedi experiments.log
|
|
EXP-0006).
|
|
decision: vedi decisions.log DEC-0007.
|
|
next_action: M6 -- dependency_manager.v.
|
|
|
|
[2026-09-05T18:00:00Z] commit=2e4cedc session=v2-M6-dependency-manager
|
|
module: hardware/v2/rtl/dependency_manager.v
|
|
action: implementato M6 -- tabella di dipendenze (node_id/state/
|
|
required/resolved/producer_ids, campi esatti §10), wake-up su
|
|
completamento produttore, dispatch first-found-ready verso il
|
|
Director (M5).
|
|
reason: roadmap M6.
|
|
result: 4/4 test PASS su un piccolo DAG a mano (node2 dipende da
|
|
ENTRAMBI node0+node1 -- dipendenze multiple; node3 dipende solo da
|
|
node0 -- risultato condiviso/piu' consumer). Confermato: node3 pronto
|
|
subito dopo node0, node2 resta WAITING finche' anche node1 non
|
|
completa. Sintesi reale: 0 problemi, 763 LUT4/474 FF/0 DSP/0 CCU2C.
|
|
Fmax reale (nessun harness necessario stavolta): 155.30 MHz.
|
|
errors: un errore di sintassi nel testbench (nested replication senza
|
|
livello di parentesi extra), non un bug RTL.
|
|
decision: vedi decisions.log DEC-0008 (nessun forwarding di valori
|
|
ancora, nessun riuso degli slot ancora -- entrambi rimandati
|
|
esplicitamente).
|
|
next_action: M7 -- dataflow_core.v, prima integrazione di
|
|
Director+Dependency Manager+Memory Manager+Processor Array+Buffer
|
|
in un unico top-level.
|
|
|
|
[2026-09-05] M7 -- hardware/v2/rtl/dataflow_core.v
|
|
reason: roadmap M7 -- first full integration of dependency_manager
|
|
(M6) + neural_director (M5) + N_SLOTS x (memory_manager (M4) +
|
|
neural_processor (M1)) into one top-level module, closing the
|
|
producer-completion -> dependency-wake-up loop end-to-end for the
|
|
first time. Additive extension to neural_director.v: added a
|
|
slot_node_id output port (which node_id occupies each slot) so a
|
|
caller can map a completed slot back to the node_id that just
|
|
finished -- re-verified M5's own testbench still passes 4/4
|
|
unaffected.
|
|
result: 4/4 test PASS on a 3-node DAG (node2 depends on BOTH node0 and
|
|
node1; confirmed it does NOT dispatch until both genuinely complete,
|
|
polled every cycle). Real synthesis: 0 problems at both N_SLOTS=2
|
|
(LUT4=2127/CCU2C=248/FF=2505/DSP=16) and N_SLOTS=4
|
|
(LUT4=3953/CCU2C=500/FF=4688/DSP=32). Real Fmax (via
|
|
harness_dataflow_core.v): 165.15 MHz (N_SLOTS=2), 133.19 MHz
|
|
(N_SLOTS=4), both PASS at 80MHz.
|
|
errors: one Yosys build-script usage quirk (errors.log ERR-0007,
|
|
chparam target ordering), not an RTL bug.
|
|
decision: see decisions.log DEC-0009 (M3 buffers not wired in yet, no
|
|
shared-PSRAM arbitration across slots yet -- both deferred to M8).
|
|
next_action: M8 -- PSRAM integration. Wire the real (unmodified) V1
|
|
PSRAM backend chain through dataflow_core end-to-end and measure/
|
|
design whatever N_SLOTS>1 arbitration real contention requires.
|