77baa8fc167907896669953b91c7664f4458636e
dataflow_core.v integrates dependency_manager (M6) -> neural_director (M5) -> N_SLOTS x (memory_manager (M4) + neural_processor (M1)) for the first time. A slot's completion (via neural_director's new slot_node_id tracking, an additive port) feeds back as a producer_done event to dependency_manager, waking up any node that depended on it - closing the dataflow loop without external glue. Verified end-to-end (Verilator) on a 3-node DAG: two independent nodes plus a third depending on both, confirmed to dispatch only after both genuinely complete via real neural_processor computation. 4/4 PASS. Real synthesis + nextpnr-ecp5 P&R via a synthesis-only timing harness (bare per-slot backend ports exceed the LFE5U-45F's TRELLIS_IO budget, same pattern as ERR-0005): N_SLOTS=2 -> 165.15 MHz, N_SLOTS=4 -> 133.19 MHz, both PASS at 80MHz, 0 synthesis problems. Scope explicitly deferred to M8 (DEC-0009): M3's BRAM buffers not wired in yet, per-slot Memory Backend Interface ports not arbitrated to one shared PSRAM master yet - both need real measured data before committing to a design, not guessed at here. Logged: simulation/synthesis/timing/benchmark/decisions (DEC-0009)/ experiments (EXP-0008)/errors (ERR-0007, a Yosys chparam-ordering build quirk, not an RTL bug)/development.log, ROADMAP.md updated. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
Description
No description provided
68 MiB
Languages
Verilog
87.7%
TeX
6.3%
Python
6%