dataflow_core.v integrates dependency_manager (M6) -> neural_director
(M5) -> N_SLOTS x (memory_manager (M4) + neural_processor (M1)) for
the first time. A slot's completion (via neural_director's new
slot_node_id tracking, an additive port) feeds back as a
producer_done event to dependency_manager, waking up any node that
depended on it - closing the dataflow loop without external glue.
Verified end-to-end (Verilator) on a 3-node DAG: two independent
nodes plus a third depending on both, confirmed to dispatch only
after both genuinely complete via real neural_processor computation.
4/4 PASS.
Real synthesis + nextpnr-ecp5 P&R via a synthesis-only timing harness
(bare per-slot backend ports exceed the LFE5U-45F's TRELLIS_IO
budget, same pattern as ERR-0005): N_SLOTS=2 -> 165.15 MHz,
N_SLOTS=4 -> 133.19 MHz, both PASS at 80MHz, 0 synthesis problems.
Scope explicitly deferred to M8 (DEC-0009): M3's BRAM buffers not
wired in yet, per-slot Memory Backend Interface ports not arbitrated
to one shared PSRAM master yet - both need real measured data before
committing to a design, not guessed at here.
Logged: simulation/synthesis/timing/benchmark/decisions (DEC-0009)/
experiments (EXP-0008)/errors (ERR-0007, a Yosys chparam-ordering
build quirk, not an RTL bug)/development.log, ROADMAP.md updated.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v