2ab2ff77697f7118fb64d6777f2f54844e4a2c00
2
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
8e014d8d49 |
V2.0.0 hardware freeze - single SDRAM
FASE #1 hardware freeze for FPGA-Neural V2, N4/P8, single external SDRAM (Alliance Memory AS4C4M16SA-6TIN) serving weights, activations, and results through one physical sdram_controller.v instance. Removes the PSRAM dependency (hardware/v1/rtl/psram_controller.v + memory_interface.v) from the V2 physical path entirely -- V1 itself remains fully unmodified, the golden reference. New RTL: sdram_unified_backend.v (2-way W/AR arbitration over one SDRAM controller, real per-byte DQM write masking added to sdram_controller.v for correct single-byte result writes with no read-modify-write), nms_neural_multiprocessor_sdram_unified.v (the frozen top-level). Two real bugs found and fixed via full-system testing before being accepted (ERR-0023): a deadlock and an off-by-one data-shift bug in the new arbitration logic. Real results: N=4 and N=2 D-Stress bit-exact (256/256 neurons), 40 real AUTO REFRESH events interleaved with zero corruption, real Yosys+nextpnr-ecp5 synthesis/P&R for LFE5U-45F-8CABGA381 (149/245 TRELLIS_IO, a real 45-pin reduction from the prior dual-memory design). Timing is MARGINAL (1/8 P&R seeds >=80MHz), reported honestly rather than masked by the best seed. Real, sourced ball-level pinout for the SDRAM bus + clk/rst (39/149 signals, P&R-verified) using the official Lattice ECP5U-45 pinout CSV found on disk during this step's own pre-commit review -- corrects an earlier draft that wrongly assumed no real pinout data was available. Chip readiness: NO. Real, disclosed blockers remain (no physical host interface exists yet -- the RTL's own reg_* ports are a 110-pin raw test-harness bus; clock source/PLL decision; power/configuration component selection) -- see hardware/v2/docs/{HARDWARE_FREEZE, CHIP_READINESS,OPEN_ITEMS}.md for the complete, itemized status. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |
||
|
|
dc0b331d3e |
feat(v2): scaffold hardware/v1 frozen baseline + M1 Neural Processor
Begins the V2 Neural Multiprocessor / Dataflow architecture per docs/v2-description.md, per explicit user request to freeze V1 and start V2 development, copying from V1 what's needed. Scaffold: - hardware/v1/: byte-exact, read-only copy of the current V1 codebase (rtl, testbenches, tools, constraints, a representative subset of synthesis results, and reference docs) -- verified identical via diff/cmp against the live top-level tree before being made filesystem-read-only. The live top-level tree is untouched and remains the project's "production" V1 (see hardware/v1/README.md and hardware/v2/logs/decisions.log DEC-0001 for why copy-not-move). - hardware/v2/: mandatory structure (rtl/sim/constraints/synthesis/ reports/scripts/logs/docs) plus the full logging system required by the spec (development/architecture/simulation/synthesis/timing/ benchmark/decisions/experiments/errors.log). M1 -- Neural Processor (hardware/v2/rtl/neural_processor.v): - 8-stage pipelined perceptron unit (P_IN=8): input align, 8 multipliers, 3-level adder tree, accumulator, bias+activation, INT8 saturation. Genuine 1-tile/cycle throughput, not just a wider combinational datapath. - 7-state FSM (NP_IDLE..NP_ERROR per docs/v2-description.md §6, with 4 baseline states merged into NP_WAIT_OPERANDS -- see decisions.log DEC-0002); valid/ready/data/last stream interfaces per §7. - Bit-exact vs the frozen hardware/v1/rtl/neuron_parallel.v + mac8.v + mac_unit.v: 7/7 tests pass (hardware/v2/sim/tb_neural_processor.v), covering regular/mixed-sign/extreme-INT8 vectors, both activations, a zero-idle-gap back-to-back-tiles throughput check, and an 8-tile job -- verified with Verilator (see below for why). - Real synthesis + place&route (Yosys + nextpnr-ecp5): 0 CHECK problems, Fmax 183.12 MHz at ACC_WIDTH=32 (PASS at 80MHz, ~3x V1's isolated PARALLEL=8 Fmax of 61.71 MHz) and 176.21 MHz at ACC_WIDTH=24 (a user-requested comparison experiment, also bit-exact-verified; see experiments.log EXP-0001/EXP-0002 and benchmark.log). Three real bugs found and resolved during M1 development (full diagnostic record in errors.log): - Two independent, reproducible Icarus Verilog v13.0 scheduling defects (ERR-0001, ERR-0002) that silently produced wrong simulation results for standard sequential Verilog -- confirmed via Verilator 5.050 giving correct results on the same minimal repros. Verilator is now the trusted simulator for hardware/v2/ (decisions.log DEC-0004); Icarus's affected protocol-violation check was removed from the RTL and deferred architecturally to the Neural Director (DEC-0003) rather than chased further. - One real RTL bug (ERR-0003): last0 wasn't gated like valid0, letting a "last tile" tag leak into the pipeline ahead of its actual valid tile on back-to-back jobs. Fixed and verified. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v |