Commit Graph
2 Commits
Author SHA1 Message Date
micheleandClaude Sonnet 5 07a48e401f fix: close 7 zero-value/mid-run guard gaps found in re-certification campaign
Fixes all 7 bugs found in the FPGA-Neural re-certification campaign
(docs/validation/bugs.md, CERTIFICATION.md), per campaign policy that
fixes land as a commit separate from the analysis work (commits
313a199..77e74db):

- BUG-005 (CRITICAL): layer_sequencer.v -- RUN_NETWORK(num_layers=0)
  ran through 256 fabricated layers reading arbitrary PSRAM data as
  descriptors. Now an immediate no-op.
- BUG-007 (CRITICAL): spi_engine.v -- SET_NET_TYPE received mid-run
  remapped the arbiter mux and hung the in-progress engine. Now
  rejected while graph_busy/seq_busy, verified not to partially apply.
- BUG-002 (MEDIA): neuron_parallel.v -- N_INPUTS=0 bypassed the
  elaboration-time guard, leaving x_bus/w_bus undriven. Guard extended
  to reject N_INPUTS==0.
- BUG-003 (MEDIA): neuron_parallel.v -- n_inputs_real=0 at runtime had
  inconsistent behavior across repeated runs. Now an explicit early-out
  via the existing "finishing" completion path.
- BUG-004 (BASSA): neuron_memory.v -- n_neurons_real=0 silently ignored
  the limit. Fixed at all three entry points into the vulnerable
  termination checks (STATE_READ_X, STATE_READ_W, and the X->W
  dispatch).
- BUG-006 (BASSA): graph_engine.v -- num_neurons_graph=0 relied on an
  incidental guard rather than a real one. Now an explicit no-op.
- BUG-001 (INFO): removed sim/top.v, confirmed dead code from the
  pre-INT8 Q8.8 era.

Every bug-reproduction testbench is rewritten from observe-only to
hard-assert the fixed behavior (sim/*_bug00[2-7]*_tb.v), verified
individually and via a full regression (44 testbenches, 43 PASS, 0
FAIL/ERROR, 1 benchmark by design). Re-verified on the real toolchain
(Yosys synth_ecp5 + nextpnr-ecp5): 0 constraint errors, Fmax 68.65 MHz
(was 67.91 MHz, within known placement noise), critical path
structurally unchanged (neuron_parallel/mac8 accumulator carry chain).

Updates docs/validation/bugs.md and CERTIFICATION.md to reflect the
resolved state, and docs/FPGA-NeuralNetwork-Engine.md + the LaTeX
datasheet (IT/EN) with inline notes on each fixed edge case, closing
the datasheet/RTL gap flagged in C.13 of the original certification.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
2026-09-04 20:29:05 +02:00
micheleandClaude Sonnet 5 55c827bedf feat: PSRAM page-mode reads + graph engine (Type #2) + real pinout/IRQ pins
PSRAM page-mode read burst support in psram_controller.v: enables the
ISSI IS66WVE4M16EBLL-70BLI's page mode via its configuration-register
software-access sequence at boot (disabled by default on the real
chip), then keeps CE#/OE# asserted after a read so a same-page
continuation only pays tAPA (20ns) instead of a full tAA (70ns)
random access, with automatic tCEM-safe session closing. Only a WRITE
closes the page -- byte-enable changes do not, since
int8_memory_access.v alternates them on nearly every access and an
early implementation attempt that treated them as a close condition
measured a real regression (53.25->61.25 cycles/edge) before being
corrected (53.25->37.53 cycles/edge, +42% gather bandwidth).
sim/psram_model.v gained independent tAPA/tAA and tCEM enforcement
(with a real Verilog same-timestep event-ordering race found and
fixed via a #0 sync) so the regression proves real timing compliance,
not just data correctness. New sim/psram_page_mode_tb.v; full 26-file
regression suite re-run clean. Real nextpnr-ecp5 Fmax re-measured on
the full spi_neuron_top system: 75.73MHz (P2, up from 55.59MHz) and
65.13MHz (P8) -- still under the 80MHz target but not regressed, with
the critical path confirmed (not assumed) to remain entirely inside
neuron_parallel's accumulate chain, never psram_controller.

Also includes this session's other already-validated work: the graph
engine (Type #2 sparse-graph network: act_buffer, graph_engine,
netasm host assembler), real CABGA381 pinout (.lpf, place&route
verified) and physical IRQ_N/DATA_READY_N pins, and Phase 7 timing
closure logs -- all previously uncommitted, documented in WORKLOG.md.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01LH3jPeJ3eFMfF2v8SQhpkk
2026-09-03 17:12:05 +02:00