Files
FPGA-Neural/hardware/v2/nms/synthesis/nms_multiproc_n8
micheleandClaude Sonnet 5 19ef54aea8 docs+synth: Phase 0 complete - N=8 baseline + toolchain discrepancy closed
N=8 baseline (EXP-0050, real fpga_neural_v2_top + v2_board_top.lpf, fresh
8-seed sweep): 8/8 PASS at 64MHz, worst 80.97MHz, mean 84.62MHz. DSP
64/72 (88.9%) confirms real N_SLOTS=8. This directly contradicts the
brief's own premise (N8 expected to collapse to ~31MHz) and the project's
historical numbers (3-5/8 pass, worst ~55-67MHz) despite bit-identical
RTL.

Investigated and closed the same discrepancy already flagged for N=4:
logs/experiments.log:2563 explicitly tags historical Fmax numbers as
measured on "Yosys 0.68+"; this session's toolchain is Yosys 0.69+59, a
nightly dated the same day as the session -- a confirmed ~59-commit
version gap. Critical-path inspection on both N=4 and N=8 confirms the
underlying RTL congestion the project diagnosed is real and still
present (same bottleneck locations as previously documented) -- the
newer toolchain just places it well enough to still clear 64MHz.

Decision: this session's numbers are adopted as the operative baseline
for Phase 1+ (see timing.log for the full writeup). Also found, not yet
applied: slot_mem_arbiter.v/slot_mem_arbiter_wide.v both still have the
runtime-indexed-crossbar anti-pattern already fixed in neural_director.v,
sitting right on the arbiter<->backend boundary the brief names -- a
concrete Phase 1 candidate.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-15 21:44:10 +00:00
..