micheleandClaude Sonnet 5 c4763aab10 test: directed SDRAM boundary verification + SPI frequency sweep
PRE-PCB CLOSURE Point 1: adds tb_sdram_boundary.v, a directed (not
randomized) regression covering address 0/1/last/last-1, an explicit
row-boundary crossing, all 3 inter-bank boundary crossings, the real
V2 memory-map region boundaries (weights/activations/results), and
every DQM byte-mask combination with explicit read-after-write.
21/21 PASS at both 64MHz and 166MHz, zero bugs found.

PRE-PCB CLOSURE Point 2: adds tb_spi_freq_sweep.v, a reproducible SPI
bit-rate sweep against the real fpga_neural_v2_top (osc_clk driven at
the real 64MHz clk_sys rate via the SIM PLL bypass). Found and fixed a
race in the new test harness itself (a fixed-time wait before reading
a WRITE_MEM/READ_MEM response, too short whenever a periodic AUTO
REFRESH delayed the backend) -- not a spi_host_bridge.v defect,
confirmed against tb_spi_host_bridge.v's own isolated regression.
Determined the real, deterministic CDC margin: the synchronizer
requires >=5 system-clock cycles per SPI bit (exactly 64MHz/5 =
12.8MHz); recommends SPI_MAX_VERIFIED=12MHz with real margin below
that hard edge.

Full writeup: hardware/v2/docs/PRE_PCB_CLOSURE_4POINT.md.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
2026-09-06 19:42:37 +02:00
micheleandClaude Sonnet 5 68f3c5e403 fix(v2): resolve ERR-0025 Part B - SRAM read timing bug in weight/activation memory
Root-causes and fixes the real, disclosed defect left open at the end
of the previous STEP20 commit: the board-level SPI host interface
produced wrong compute results when jobs were dispatched with
realistic (widely time-separated) pacing, even though job registration
itself was already confirmed correct at the dependency_manager
handshake.

Root cause: nms_weight_packed.v and nms_activation_replicated.v both
used a REGISTERED SRAM read (rd_data_reg <= mem[addr], one full clock
of latency), but nms_memory_manager_stream_wide.v's own read-ahead
pipeline (its `rd_pending` bit) is designed around a COMBINATIONAL
read -- a request issued this cycle produces data already valid to
capture the very next cycle. A busy, multi-tile job (e.g. the STEP19
D-Stress regression, 16 tiles/neuron) never exposes the mismatch,
since its own weight/activation prefetch always runs far enough ahead
that any given tile has been sitting stable in the SRAM for many
cycles by the time it's actually consumed. An uncontested single-tile
job has zero such margin: its one tile's read fires on the exact edge
the data nominally becomes ready, landing squarely on the missing
cycle and permanently latching stale/zero data.

Fixed by making both SRAMs' reads combinational, with an explicit
same-cycle fill/read address-match bypass for the one hazard a plain
combinational read alone would still miss. No FSM, arbiter, or SDRAM
controller logic was touched.

Verified (Verilator, per this project's own standing DEC-0004
protocol):
- tb_fpga_neural_v2_top_smoke.v: 11/11 PASS -- single job, back-to-back
  jobs, a realistic ~85us-gap job pair, and a parametric sweep of
  inter-job gaps (100ns/5000ns/50000ns).
- STEP19 D-Stress N=2: 49788 cycles, 256/256 bit-exact -- identical
  cycle count to before this fix (zero regression).
- STEP19 D-Stress N=4: 49771 cycles, 256/256 bit-exact -- identical
  cycle count to before this fix (zero regression).
- tb_sdram_unified_backend.v (40/40) and tb_spi_host_bridge.v (18/18)
  reconfirmed unaffected.

The physical SPI host interface is now verified correct end-to-end.
Real synthesis/P&R of the board-level top (fpga_neural_v2_top.v) is
the deliberate next step, not yet performed this round.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
2026-09-06 17:33:45 +02:00
micheleandClaude Sonnet 5 43abf28b5b V2.1.0-dev: SPI host bridge + clock/reset architecture (NOT release-ready)
STEP20 work toward the V2 hardware release gate. Adds real new RTL
implementing the three pieces the previous freeze (V2.0.0) explicitly
left open, plus real, disclosed verification findings. Does NOT
declare hardware release complete -- see below.

New RTL:
- spi_host_bridge.v: real SPI slave protocol engine (WRITE_JOB/
  WRITE_MEM/READ_MEM/STATUS/RESET opcodes), replacing the 110-pin
  reg_* testbench bus as the intended physical host interface.
  Isolated regression 18/18 PASS (tb_spi_host_bridge.v); two real
  MISO-timing bugs found and fixed during its own development (see
  the module's header for the root-cause writeup).
- ecp5_pll_sys_clk.v: real, tool-generated (Project Trellis ecppll)
  EHXPLLL wrapper, 16MHz oscillator -> 64MHz system clock, with a
  declared (not fabricated) simulation-only PLL bypass.
- reset_sync.v: standard async-assert/sync-deassert reset bridge
  gating on external POR and PLL lock.
- fpga_neural_v2_top.v: board-level top wiring the above around the
  STEP19 compute+memory design's own already-frozen submodules
  (zero modification to neural_processor.v, dependency_manager.v,
  sdram_unified_backend.v, or any other previously-frozen file).

Real findings from this step's own re-verification (both logged in
full in hardware/v2/logs/errors.log):
- ERR-0024: the current Icarus Verilog v13.0 install (updated since
  the last freeze) gives WRONG bit-exact results for the
  already-committed STEP19 regression. Cross-checked against
  Verilator per this project's own standing protocol (DEC-0004) --
  the STEP19 baseline (single SDRAM, N=2/N=4, raw reg_* interface) IS
  bit-exact correct, reconfirmed today, matching the historical cycle
  counts exactly. Two provably-zero-behavior-change declaration-order
  fixes were required just to get the current toolchain to elaborate
  the already-shipped STEP19 files at all.
- ERR-0025: a real SPI-bridge protocol race (fixed) plus a SEPARATE,
  real, UNRESOLVED defect -- two jobs dispatched through the real SPI
  path with realistic pacing produce wrong compute results, even
  though job registration itself is confirmed correct at the
  handshake. Root cause not yet isolated. Committed as a known-failing
  regression (tb_fpga_neural_v2_top_smoke.v) documenting the gap
  honestly rather than hiding it.

Given ERR-0025 Part B is real and unresolved, synthesis/P&R of the new
board-level top was deliberately not attempted this round, and V2
hardware release is NOT declared complete. See decisions.log DEC-0036
and hardware/v2/docs/{CHIP_READINESS,OPEN_ITEMS}.md for the full,
itemized status.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
2026-09-06 14:35:14 +02:00
micheleandClaude Sonnet 5 8e014d8d49 V2.0.0 hardware freeze - single SDRAM
FASE #1 hardware freeze for FPGA-Neural V2, N4/P8, single external
SDRAM (Alliance Memory AS4C4M16SA-6TIN) serving weights, activations,
and results through one physical sdram_controller.v instance. Removes
the PSRAM dependency (hardware/v1/rtl/psram_controller.v +
memory_interface.v) from the V2 physical path entirely -- V1 itself
remains fully unmodified, the golden reference.

New RTL: sdram_unified_backend.v (2-way W/AR arbitration over one
SDRAM controller, real per-byte DQM write masking added to
sdram_controller.v for correct single-byte result writes with no
read-modify-write), nms_neural_multiprocessor_sdram_unified.v (the
frozen top-level). Two real bugs found and fixed via full-system
testing before being accepted (ERR-0023): a deadlock and an off-by-one
data-shift bug in the new arbitration logic.

Real results: N=4 and N=2 D-Stress bit-exact (256/256 neurons), 40
real AUTO REFRESH events interleaved with zero corruption, real
Yosys+nextpnr-ecp5 synthesis/P&R for LFE5U-45F-8CABGA381 (149/245
TRELLIS_IO, a real 45-pin reduction from the prior dual-memory
design). Timing is MARGINAL (1/8 P&R seeds >=80MHz), reported honestly
rather than masked by the best seed.

Real, sourced ball-level pinout for the SDRAM bus + clk/rst (39/149
signals, P&R-verified) using the official Lattice ECP5U-45 pinout CSV
found on disk during this step's own pre-commit review -- corrects an
earlier draft that wrongly assumed no real pinout data was available.

Chip readiness: NO. Real, disclosed blockers remain (no physical host
interface exists yet -- the RTL's own reg_* ports are a 110-pin raw
test-harness bus; clock source/PLL decision; power/configuration
component selection) -- see hardware/v2/docs/{HARDWARE_FREEZE,
CHIP_READINESS,OPEN_ITEMS}.md for the complete, itemized status.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
2026-09-06 13:39:55 +02:00