Memory upgrade, at the user's own explicit request: Alliance Memory
AS4C4M16SA-6TIN (64Mbit/8MB) -> AS4C32M16SB-7BIN (512Mbit/64MB, 54-ball
TFBGA), the largest same-family SDR SDRAM Alliance Memory offers.
Real-datasheet-driven (whole AS4C4M16SA/AS4C8M16SA/AS4C16M16SA/
AS4C32M16SA family investigated): 13 row bits (was 12, one new FPGA
pin sdram_a[12]/ball F1), 10 column bits (was 8), real -7-grade AC
timing (tRCD/tRP improved to 15ns, tREFI halved to 7.8us for the
doubled row count). sdram_controller.v and sdram_model.v gained real
ROW_BITS/COL_BITS/BANK_BITS parameters (was hardcoded 12/8/2).
ADDR_WIDTH widened 23->26 bits across the live instantiation tree.
This required a real SPI protocol change (spi_host_bridge.v): a 26-bit
byte address no longer fits in 3 bytes -- every address field widened
3->4 bytes (WRITE_JOB 15->18 payload bytes, WRITE_MEM/READ_MEM header
5->6 bytes).
Found and fixed two real timing regressions via nextpnr-ecp5 P&R
(not assumed): neural_director.v's own runtime-indexed demux write
(ERR-0027, was silently synthesizing an extra MULT18X18D) and
nms_activation_fill_ctrl_v3.v's own linear N_SLOTS-wide max-scan
(ERR-0028, became dominant at N_SLOTS=8) -- both replaced with
constant-indexed/tree-based equivalents, bit-exact same behavior,
confirmed via full D-Stress N=2/4/8 regression (identical cycle
counts). N_SLOTS=4 now fully closes timing at 64MHz (8/8 seeds);
N_SLOTS=8 significantly improved but not yet fully reliable (5/8
seeds) -- honestly disclosed, not claimed complete.
Full regression re-verified: sdram_controller (461/461, 18 configs),
tb_sdram_boundary (21/21), D-Stress N=2/4/8 (bit-exact), spi_host_bridge
(18/18), board-level SPI smoke test (11/11), unified backend (40/40).
See hardware/v2/docs/MEMORY_UPGRADE_64MB_N8.md for the full
investigation, and errors.log/decisions.log (ERR-0027, ERR-0028,
DEC-0039) for the complete root-cause writeups.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
STEP20 work toward the V2 hardware release gate. Adds real new RTL
implementing the three pieces the previous freeze (V2.0.0) explicitly
left open, plus real, disclosed verification findings. Does NOT
declare hardware release complete -- see below.
New RTL:
- spi_host_bridge.v: real SPI slave protocol engine (WRITE_JOB/
WRITE_MEM/READ_MEM/STATUS/RESET opcodes), replacing the 110-pin
reg_* testbench bus as the intended physical host interface.
Isolated regression 18/18 PASS (tb_spi_host_bridge.v); two real
MISO-timing bugs found and fixed during its own development (see
the module's header for the root-cause writeup).
- ecp5_pll_sys_clk.v: real, tool-generated (Project Trellis ecppll)
EHXPLLL wrapper, 16MHz oscillator -> 64MHz system clock, with a
declared (not fabricated) simulation-only PLL bypass.
- reset_sync.v: standard async-assert/sync-deassert reset bridge
gating on external POR and PLL lock.
- fpga_neural_v2_top.v: board-level top wiring the above around the
STEP19 compute+memory design's own already-frozen submodules
(zero modification to neural_processor.v, dependency_manager.v,
sdram_unified_backend.v, or any other previously-frozen file).
Real findings from this step's own re-verification (both logged in
full in hardware/v2/logs/errors.log):
- ERR-0024: the current Icarus Verilog v13.0 install (updated since
the last freeze) gives WRONG bit-exact results for the
already-committed STEP19 regression. Cross-checked against
Verilator per this project's own standing protocol (DEC-0004) --
the STEP19 baseline (single SDRAM, N=2/N=4, raw reg_* interface) IS
bit-exact correct, reconfirmed today, matching the historical cycle
counts exactly. Two provably-zero-behavior-change declaration-order
fixes were required just to get the current toolchain to elaborate
the already-shipped STEP19 files at all.
- ERR-0025: a real SPI-bridge protocol race (fixed) plus a SEPARATE,
real, UNRESOLVED defect -- two jobs dispatched through the real SPI
path with realistic pacing produce wrong compute results, even
though job registration itself is confirmed correct at the
handshake. Root cause not yet isolated. Committed as a known-failing
regression (tb_fpga_neural_v2_top_smoke.v) documenting the gap
honestly rather than hiding it.
Given ERR-0025 Part B is real and unresolved, synthesis/P&R of the new
board-level top was deliberately not attempted this round, and V2
hardware release is NOT declared complete. See decisions.log DEC-0036
and hardware/v2/docs/{CHIP_READINESS,OPEN_ITEMS}.md for the full,
itemized status.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v