Begins the V2 Neural Multiprocessor / Dataflow architecture per
docs/v2-description.md, per explicit user request to freeze V1 and
start V2 development, copying from V1 what's needed.
Scaffold:
- hardware/v1/: byte-exact, read-only copy of the current V1 codebase
(rtl, testbenches, tools, constraints, a representative subset of
synthesis results, and reference docs) -- verified identical via
diff/cmp against the live top-level tree before being made
filesystem-read-only. The live top-level tree is untouched and
remains the project's "production" V1 (see hardware/v1/README.md
and hardware/v2/logs/decisions.log DEC-0001 for why copy-not-move).
- hardware/v2/: mandatory structure (rtl/sim/constraints/synthesis/
reports/scripts/logs/docs) plus the full logging system required by
the spec (development/architecture/simulation/synthesis/timing/
benchmark/decisions/experiments/errors.log).
M1 -- Neural Processor (hardware/v2/rtl/neural_processor.v):
- 8-stage pipelined perceptron unit (P_IN=8): input align, 8
multipliers, 3-level adder tree, accumulator, bias+activation, INT8
saturation. Genuine 1-tile/cycle throughput, not just a wider
combinational datapath.
- 7-state FSM (NP_IDLE..NP_ERROR per docs/v2-description.md §6, with
4 baseline states merged into NP_WAIT_OPERANDS -- see
decisions.log DEC-0002); valid/ready/data/last stream interfaces
per §7.
- Bit-exact vs the frozen hardware/v1/rtl/neuron_parallel.v + mac8.v
+ mac_unit.v: 7/7 tests pass (hardware/v2/sim/tb_neural_processor.v),
covering regular/mixed-sign/extreme-INT8 vectors, both activations,
a zero-idle-gap back-to-back-tiles throughput check, and an 8-tile
job -- verified with Verilator (see below for why).
- Real synthesis + place&route (Yosys + nextpnr-ecp5): 0 CHECK
problems, Fmax 183.12 MHz at ACC_WIDTH=32 (PASS at 80MHz, ~3x V1's
isolated PARALLEL=8 Fmax of 61.71 MHz) and 176.21 MHz at ACC_WIDTH=24
(a user-requested comparison experiment, also bit-exact-verified;
see experiments.log EXP-0001/EXP-0002 and benchmark.log).
Three real bugs found and resolved during M1 development (full
diagnostic record in errors.log):
- Two independent, reproducible Icarus Verilog v13.0 scheduling
defects (ERR-0001, ERR-0002) that silently produced wrong simulation
results for standard sequential Verilog -- confirmed via Verilator
5.050 giving correct results on the same minimal repros. Verilator
is now the trusted simulator for hardware/v2/ (decisions.log
DEC-0004); Icarus's affected protocol-violation check was removed
from the RTL and deferred architecturally to the Neural Director
(DEC-0003) rather than chased further.
- One real RTL bug (ERR-0003): last0 wasn't gated like valid0,
letting a "last tile" tag leak into the pipeline ahead of its
actual valid tile on back-to-back jobs. Fixed and verified.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v