Commit Graph
5 Commits
Author SHA1 Message Date
michele 342792df2d Ship Fase B slices: hierarchy, derating bands, timing, PI, ESD/return.
ERROR stays only for RULE+MANDATORY. Hierarchy walks component→pin→net→block.
Derating is PASS/MARGIN/RISK from Vop/Vrated. Timing and PI skip without numbers.
ESD and HS return path are REVIEW, not RULE ERROR.
2026-09-20 09:35:04 +02:00
michele dc65e96a22 Apply the finding engine to schematic and PCB reviews.
FACT, REQUIREMENT, and INFERENCE are separate fields; datasheet provenance
lives in the rule DB so Recommended cannot stay ERROR; LLM output is REVIEW.
Designer decisions persist across rescans. Schematic and PCB share one library
and the same finding object in the report UI.
2026-09-20 08:38:59 +02:00
michele 8f4ebc645c Share library/extracted for schematic and PCB review.
PCB AI skips a second PDF exam (pintable cache, pdf_path=None) and the report
gains a PCB exam section plus power-trace, thermal, via, Kelvin, and GND-stitch
checks grounded in board geometry and extracted specs.
2026-09-20 08:32:23 +02:00
michele a2011dad91 Update PCB review plan: AI exam like schematic, no auto-place.
Adds per-IC LLM review, domains/groups as exam context, required
recommendations, and phased job MODE=pcb. Packing stays parked.
2026-09-19 22:43:58 +02:00
michele 721ede4243 Add PCB review plan: verify placement and routing, no auto-place.
Documents a parallel MODE=pcb exam job (inventory + datasheet-gated
checks) that reuses placement_check, si_check, and the placement job
pattern. Parks F2 packing/export.
2026-09-19 21:41:27 +02:00