Adds hardware/v2/docs/PRE_PCB_VERIFICATION.md as the single authoritative pre-schematic verification record: RTL/ERR-0025/ regression re-verification, clock/reset, synthesis/P&R re-audit, setup/hold timing status, the real SDRAM datasheet-parameter audit table (Alliance Memory AS4C4M16SA-6TIN Table 17), SPI host bridge protocol documentation, FPGA power/pinout tables, first-board bring-up and benchmark status, and cross-domain consistency audit. Freezes the FPGA configuration flash: Winbond W25Q32JVSSIQ (32Mbit, SOIC-8, 2.7-3.6V, standard SPI, ECP5 Master-SPI-boot compatible) -- this was the one section-11 item the governing mandate required not be left OPEN. Marks CHIP_READINESS.md/OPEN_ITEMS.md/PINOUT.md/CLOCK_ARCHITECTURE.md/ POWER_ARCHITECTURE.md/SCHEMATIC_READINESS.md as superseded (they predate the SPI host bridge, PLL, and this session's SDRAM datasheet audit) with pointers to the new consolidated document, rather than rewriting each individually. Updates the V2 LaTeX datasheet's status/roadmap chapter to reflect the SDRAM datasheet audit and configuration-flash decisions, rebuilds the PDF (clean compile, 16 pages). Classification: PRE-PCB VERIFIED. Schematic and PCB implementation remain user-owned and not started. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
155 KiB
155 KiB