Begins the V2 Neural Multiprocessor / Dataflow architecture per docs/v2-description.md, per explicit user request to freeze V1 and start V2 development, copying from V1 what's needed. Scaffold: - hardware/v1/: byte-exact, read-only copy of the current V1 codebase (rtl, testbenches, tools, constraints, a representative subset of synthesis results, and reference docs) -- verified identical via diff/cmp against the live top-level tree before being made filesystem-read-only. The live top-level tree is untouched and remains the project's "production" V1 (see hardware/v1/README.md and hardware/v2/logs/decisions.log DEC-0001 for why copy-not-move). - hardware/v2/: mandatory structure (rtl/sim/constraints/synthesis/ reports/scripts/logs/docs) plus the full logging system required by the spec (development/architecture/simulation/synthesis/timing/ benchmark/decisions/experiments/errors.log). M1 -- Neural Processor (hardware/v2/rtl/neural_processor.v): - 8-stage pipelined perceptron unit (P_IN=8): input align, 8 multipliers, 3-level adder tree, accumulator, bias+activation, INT8 saturation. Genuine 1-tile/cycle throughput, not just a wider combinational datapath. - 7-state FSM (NP_IDLE..NP_ERROR per docs/v2-description.md §6, with 4 baseline states merged into NP_WAIT_OPERANDS -- see decisions.log DEC-0002); valid/ready/data/last stream interfaces per §7. - Bit-exact vs the frozen hardware/v1/rtl/neuron_parallel.v + mac8.v + mac_unit.v: 7/7 tests pass (hardware/v2/sim/tb_neural_processor.v), covering regular/mixed-sign/extreme-INT8 vectors, both activations, a zero-idle-gap back-to-back-tiles throughput check, and an 8-tile job -- verified with Verilator (see below for why). - Real synthesis + place&route (Yosys + nextpnr-ecp5): 0 CHECK problems, Fmax 183.12 MHz at ACC_WIDTH=32 (PASS at 80MHz, ~3x V1's isolated PARALLEL=8 Fmax of 61.71 MHz) and 176.21 MHz at ACC_WIDTH=24 (a user-requested comparison experiment, also bit-exact-verified; see experiments.log EXP-0001/EXP-0002 and benchmark.log). Three real bugs found and resolved during M1 development (full diagnostic record in errors.log): - Two independent, reproducible Icarus Verilog v13.0 scheduling defects (ERR-0001, ERR-0002) that silently produced wrong simulation results for standard sequential Verilog -- confirmed via Verilator 5.050 giving correct results on the same minimal repros. Verilator is now the trusted simulator for hardware/v2/ (decisions.log DEC-0004); Icarus's affected protocol-violation check was removed from the RTL and deferred architecturally to the Neural Director (DEC-0003) rather than chased further. - One real RTL bug (ERR-0003): last0 wasn't gated like valid0, letting a "last tile" tag leak into the pipeline ahead of its actual valid tile on back-to-back jobs. Fixed and verified. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
2.2 KiB
2.2 KiB
FPGA-Neural V2 — stato roadmap
Fonte del mandato: docs/v2-description.md (root del repository). Baseline
funzionale/numerica/bit-exact: hardware/v1/ (frozen, sola lettura — vedi
hardware/v1/README.md).
Legenda: [ ] non iniziato · [~] in corso · [x] completo (sim+synth+timing
reali, non solo scritto).
- M1 — Neural Processor (
hardware/v2/rtl/neural_processor.v, P8). Bit-exact vs V1 (7/7 test, Verilator), pipeline a 8 stadi funzionante, throughput reale (1 tile/ciclo). Sintesi reale: 0 problemi CHECK, Fmax 183.12 MHz (ACC_WIDTH=32) — vedilogs/experiments.logEXP-0001/EXP-0002,logs/errors.logper 3 bug reali trovati e risolti (2 del toolchain Icarus, 1 RTL). - M2 — Processor Array (
neural_processor_array.v). Test 1/2/4/8 processor, misurare timing/risorse/throughput/utilization. - M3 — Buffers (
activation_buffer.v,weight_buffer.v,result_buffer.v). - M4 — Memory Manager (
memory_manager.v,prefetch_engine.v), backend PSRAM V1 riusato senza modifiche. - M5 — Neural Director (
neural_director.v), scheduling first-free. - M6 — Dependency Manager (
dependency_manager.v), ready/waiting queue, dependency counters, wake-up, producer tracking. - M7 — Dataflow Core (
dataflow_core.v), integrazione completa. - M8 — PSRAM integration, controller V1 non modificato, misura reale.
- M9 — Full benchmark, tabella V1 vs V2 (§32 del mandato).
- M10 — Optimization, solo sulla base dei dati raccolti in M1-M9.
Log
Vedi hardware/v2/logs/ (development.log per la cronologia di sessione,
decisions.log per le decisioni architetturali con motivazione,
experiments.log per ogni EXP-XXXX end-to-end).
Regole non negoziabili attive (§34 del mandato, per riferimento rapido)
- V1 (
hardware/v1/) rimane intatta — mai modificata. - V2 vive esclusivamente sotto
hardware/v2/. - Nessun risultato inventato: THEORETICAL vs SIMULATED vs SYNTHESIZED vs POST-P&R sempre etichettati esplicitamente.
- Ogni modifica/esperimento/decisione registrata nei log, mai persa.
- Ogni esperimento ha un ID univoco, mai riutilizzato — anche i FAIL restano.