feat(v2): scaffold hardware/v1 frozen baseline + M1 Neural Processor

Begins the V2 Neural Multiprocessor / Dataflow architecture per
docs/v2-description.md, per explicit user request to freeze V1 and
start V2 development, copying from V1 what's needed.

Scaffold:
- hardware/v1/: byte-exact, read-only copy of the current V1 codebase
  (rtl, testbenches, tools, constraints, a representative subset of
  synthesis results, and reference docs) -- verified identical via
  diff/cmp against the live top-level tree before being made
  filesystem-read-only. The live top-level tree is untouched and
  remains the project's "production" V1 (see hardware/v1/README.md
  and hardware/v2/logs/decisions.log DEC-0001 for why copy-not-move).
- hardware/v2/: mandatory structure (rtl/sim/constraints/synthesis/
  reports/scripts/logs/docs) plus the full logging system required by
  the spec (development/architecture/simulation/synthesis/timing/
  benchmark/decisions/experiments/errors.log).

M1 -- Neural Processor (hardware/v2/rtl/neural_processor.v):
- 8-stage pipelined perceptron unit (P_IN=8): input align, 8
  multipliers, 3-level adder tree, accumulator, bias+activation, INT8
  saturation. Genuine 1-tile/cycle throughput, not just a wider
  combinational datapath.
- 7-state FSM (NP_IDLE..NP_ERROR per docs/v2-description.md §6, with
  4 baseline states merged into NP_WAIT_OPERANDS -- see
  decisions.log DEC-0002); valid/ready/data/last stream interfaces
  per §7.
- Bit-exact vs the frozen hardware/v1/rtl/neuron_parallel.v + mac8.v
  + mac_unit.v: 7/7 tests pass (hardware/v2/sim/tb_neural_processor.v),
  covering regular/mixed-sign/extreme-INT8 vectors, both activations,
  a zero-idle-gap back-to-back-tiles throughput check, and an 8-tile
  job -- verified with Verilator (see below for why).
- Real synthesis + place&route (Yosys + nextpnr-ecp5): 0 CHECK
  problems, Fmax 183.12 MHz at ACC_WIDTH=32 (PASS at 80MHz, ~3x V1's
  isolated PARALLEL=8 Fmax of 61.71 MHz) and 176.21 MHz at ACC_WIDTH=24
  (a user-requested comparison experiment, also bit-exact-verified;
  see experiments.log EXP-0001/EXP-0002 and benchmark.log).

Three real bugs found and resolved during M1 development (full
diagnostic record in errors.log):
- Two independent, reproducible Icarus Verilog v13.0 scheduling
  defects (ERR-0001, ERR-0002) that silently produced wrong simulation
  results for standard sequential Verilog -- confirmed via Verilator
  5.050 giving correct results on the same minimal repros. Verilator
  is now the trusted simulator for hardware/v2/ (decisions.log
  DEC-0004); Icarus's affected protocol-violation check was removed
  from the RTL and deferred architecturally to the Neural Director
  (DEC-0003) rather than chased further.
- One real RTL bug (ERR-0003): last0 wasn't gated like valid0,
  letting a "last tile" tag leak into the pipeline ahead of its
  actual valid tile on back-to-back jobs. Fixed and verified.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
This commit is contained in:
2026-09-05 14:06:53 +02:00
co-authored by Claude Sonnet 5
parent 07a48e401f
commit dc0b331d3e
161 changed files with 1151210 additions and 0 deletions
+203
View File
@@ -0,0 +1,203 @@
# V2 decisions log -- formato DEC-XXXX, mai sovrascritto (vedi README.md)
DEC-0001
DATE: 2026-09-05
DECISION:
Congelare V1 come copia separata in hardware/v1/ (sola lettura a livello
filesystem) invece di spostare (git mv) l'albero top-level esistente
(rtl/, sim/, synth/, tools/) dentro hardware/v1/.
WHY:
docs/v2-description.md §1/§34 impone una "struttura obbligatoria"
hardware/v1/ + hardware/v2/ e vieta di modificare/degradare V1. Due
strade possibili: (a) spostare fisicamente rtl/sim/synth/tools
nell'albero hardware/v1/, oppure (b) copiarli lasciando l'albero
top-level esattamente come e' oggi. Lo spostamento romperebbe tutti i
riferimenti a percorso in WORKLOG.md, docs/validation/*.md,
docs/FPGA-NeuralNetwork-Engine.md (centinaia di citazioni tipo
"rtl/neuron_parallel.v:127") e negli script (tools/run_regression.py
resta funzionante per costruzione relativa, ma altri riferimenti
documentali no) -- un costo reale senza benefico funzionale, dato che
l'obiettivo della regola e' *non perdere/alterare* V1, non *dove* vive
fisicamente. La copia raggiunge lo stesso obiettivo (baseline
funzionale/numerica/bit-exact per V2, mai modificabile) senza il
rischio di rompere la cronologia documentale esistente.
EVIDENCE:
- `diff -rq rtl/ hardware/v1/rtl/` e confronto file-per-file su
sim/*.v: 0 differenze (copia bit-esatta verificata, non assunta).
- hardware/v1/ reso sola lettura (`chmod -R a-w`) subito dopo la copia,
prima di qualunque lavoro V2.
ALTERNATIVES:
- git mv dell'intero albero rtl/sim/synth/tools sotto hardware/v1/,
poi aggiornamento di tutti i riferimenti di percorso nella
documentazione. Scartata: costo/rischio alto, beneficio nullo
rispetto all'obiettivo dichiarato della regola.
- Symlink hardware/v1/ -> ../../rtl ecc. Scartata: non garantisce
l'immutabilita' (un simlink non protegge dalla modifica dell'originale
ed e' fragile rispetto a `chmod -R a-w`).
RESULT:
hardware/v1/ creato come copia bit-esatta e sola-lettura. L'albero
top-level del repository resta la "produzione" V1 corrente, invariata,
usata anche dal resto del progetto (WORKLOG.md, docs/) esattamente come
prima di questa sessione.
STATUS:
ACCEPTED
DEC-0002
DATE: 2026-09-05
DECISION:
Collapse §6's baseline Neural Processor FSM states NP_LOAD_TILE,
NP_MAC, NP_ACCUM, NP_NEXT_TILE into the single NP_WAIT_OPERANDS state
in the actual implementation (hardware/v2/rtl/neural_processor.v),
rather than implementing them as four separate one-cycle-gated states.
WHY:
§5 explicitly states the internal datapath must be pipelined and the
goal is throughput, not minimal latency -- accepting a new P_IN-wide
tile every cycle. Gating tile acceptance behind four sequential FSM
states (each holding for exactly one cycle per tile) would recreate a
non-pipelined, one-tile-per-4-cycles controller, directly
contradicting §5/§34 ("ottimizzare il throughput effettivo"). The four
states from §6's baseline list describe what the ORIGINAL (pre-M1)
sketch assumed before the pipeline design in §5 was fully worked out;
once the datapath is genuinely pipelined, tile acceptance becomes a
single steady-state condition (operand_valid && operand_ready), and
per-tile progress is tracked by the valid/last tags flowing through
the pipeline registers, not by the outer FSM.
EVIDENCE:
EXP-0001 (bit-exact vs V1, 7/7 tests incl. a deliberate zero-idle-gap
back-to-back-tiles case, TEST 5 in tb_neural_processor.v) -- confirms
tiles are genuinely accepted one per cycle with no outer-FSM stall
between them.
ALTERNATIVES:
Literal 11-state FSM per §6's baseline list, with LOAD_TILE/MAC/
ACCUM/NEXT_TILE each a real one-cycle state gating acceptance.
Rejected: would cap throughput at 1 tile per 4 cycles, defeating the
pipeline's own purpose.
RESULT:
7-state FSM (NP_IDLE, NP_LOAD_JOB, NP_WAIT_OPERANDS, NP_FINISH,
NP_WRITE_RESULT, NP_DONE, NP_ERROR) implemented and verified.
STATUS:
ACCEPTED
---
DEC-0003
DATE: 2026-09-05
DECISION:
Remove the operand-arrival protocol-violation guard from
neural_processor.v (the check that would raise NP_ERROR if
operand_valid arrived while the processor could not consume it) rather
than continue debugging it. Defer this responsibility to the Neural
Director (M5).
WHY:
The guard's own evaluation triggered ERR-0002 (docs/v2-description.md
mandate §25-29 requires documenting this, not hiding it) -- a
reproducible Icarus Verilog v13.0 bug where the guard's condition
evaluated true despite operand_valid being independently confirmed 0.
Root cause was bisected down to a minimal FSM transition unrelated to
this specific expression (see errors.log ERR-0002), meaning the bug is
in the toolchain's scheduling, not fixable by rewording the condition.
Architecturally, a standalone Neural Processor policing its OWN
issuer's protocol is also arguably the wrong owner of that
responsibility: per §34's own division of labor ("Il Director gestisce
WHAT deve essere eseguito"), arbitrating/validating operand issuance
across possibly-multiple Neural Processors is the Director's job, not
each processor's.
EVIDENCE:
ERR-0002 (errors.log) -- the guard, and several simplified variants of
it, all misevaluated under Icarus v13.0; disabling it entirely (and
only it) restored correct behavior in every case, confirmed via
Verilator that the underlying pipeline logic was already correct.
ALTERNATIVES:
1. Keep chasing the exact Icarus root cause. Rejected for this
session: already bisected to a toolchain-level scheduling issue
independent of this specific code, further chasing would not
change the architectural need for this check to live in the
Director eventually anyway.
2. Reimplement the same check with different Verilog phrasing.
Rejected: multiple independent phrasings all reproduced the bug.
RESULT:
NP_ERROR is now reachable only via the `default:` case branch (a
genuine np_state encoding corruption) -- a real safety net, just not
exercised by operand-arrival timing. The corresponding negative test
(TEST 7) was removed from tb_neural_processor.v; the scenario is
deferred to M5's testbench (tb_neural_director.v), where the Director
is the actual issuer under test.
STATUS:
ACCEPTED
---
DEC-0004
DATE: 2026-09-05
DECISION:
Adopt Verilator 5.050 (`verilator --binary --timing`) as the primary/
trusted simulator for hardware/v2/ testbenches going forward, in
addition to (not instead of) Icarus Verilog. Cross-check any Icarus
result that looks anomalous against Verilator before concluding it is
an RTL bug.
WHY:
ERR-0001/ERR-0002 (errors.log) are two independently-reproduced Icarus
Verilog v13.0 defects that produced WRONG simulation results (not
compile errors) for straightforward, standard sequential Verilog, with
no workaround available at the RTL/testbench level for ERR-0002 short
of removing the affected logic. Verilator gave the CORRECT result for
every one of these repros. §30's rule against invented results cuts
both ways: a simulator that silently gives a WRONG "measured" result is
just as dangerous as inventing one outright -- cross-checking against
a second, architecturally different simulator (Verilator compiles to
C++, Icarus interprets bytecode -- unlikely to share the same
scheduling bug) is now mandatory whenever a hardware/v2/ testbench
shows unexpected behavior.
EVIDENCE:
- Minimal FSM repro (`if (go) st<=B;`, no tasks, no other logic):
Icarus v13.0 fails to transition on specific testbench edge-count
parities; Verilator 5.050 gives the correct result every time.
- Full hardware/v2/sim/tb_neural_processor.v: Icarus v13.0 hangs/
misbehaves even after every known-real RTL bug (ERR-0003) was fixed;
the SAME unmodified file under Verilator gives 7/7 PASS, bit-exact
vs the frozen V1 reference.
ALTERNATIVES:
1. Downgrade Icarus to an older release. Rejected: no older bottle was
cached on this machine (`brew list --versions icarus-verilog` shows
only 13.0) and fetching a specific historical formula version was
not attempted this session (time-boxed decision, revisit if it
becomes a recurring blocker).
2. Keep using only Icarus and manually work around each new defect as
found. Rejected: not sustainable across the dozens of testbenches
the full V2 roadmap requires (§20).
RESULT:
Verilator installed (`brew install verilator`, 5.050). hardware/v2/
testbenches are compiled/run with both simulators when convenient;
Verilator's result is authoritative when the two disagree, and any
such disagreement is logged here / in errors.log, not silently
resolved by picking whichever answer looks more convenient.
STATUS:
ACCEPTED