feat(v2): scaffold hardware/v1 frozen baseline + M1 Neural Processor

Begins the V2 Neural Multiprocessor / Dataflow architecture per
docs/v2-description.md, per explicit user request to freeze V1 and
start V2 development, copying from V1 what's needed.

Scaffold:
- hardware/v1/: byte-exact, read-only copy of the current V1 codebase
  (rtl, testbenches, tools, constraints, a representative subset of
  synthesis results, and reference docs) -- verified identical via
  diff/cmp against the live top-level tree before being made
  filesystem-read-only. The live top-level tree is untouched and
  remains the project's "production" V1 (see hardware/v1/README.md
  and hardware/v2/logs/decisions.log DEC-0001 for why copy-not-move).
- hardware/v2/: mandatory structure (rtl/sim/constraints/synthesis/
  reports/scripts/logs/docs) plus the full logging system required by
  the spec (development/architecture/simulation/synthesis/timing/
  benchmark/decisions/experiments/errors.log).

M1 -- Neural Processor (hardware/v2/rtl/neural_processor.v):
- 8-stage pipelined perceptron unit (P_IN=8): input align, 8
  multipliers, 3-level adder tree, accumulator, bias+activation, INT8
  saturation. Genuine 1-tile/cycle throughput, not just a wider
  combinational datapath.
- 7-state FSM (NP_IDLE..NP_ERROR per docs/v2-description.md §6, with
  4 baseline states merged into NP_WAIT_OPERANDS -- see
  decisions.log DEC-0002); valid/ready/data/last stream interfaces
  per §7.
- Bit-exact vs the frozen hardware/v1/rtl/neuron_parallel.v + mac8.v
  + mac_unit.v: 7/7 tests pass (hardware/v2/sim/tb_neural_processor.v),
  covering regular/mixed-sign/extreme-INT8 vectors, both activations,
  a zero-idle-gap back-to-back-tiles throughput check, and an 8-tile
  job -- verified with Verilator (see below for why).
- Real synthesis + place&route (Yosys + nextpnr-ecp5): 0 CHECK
  problems, Fmax 183.12 MHz at ACC_WIDTH=32 (PASS at 80MHz, ~3x V1's
  isolated PARALLEL=8 Fmax of 61.71 MHz) and 176.21 MHz at ACC_WIDTH=24
  (a user-requested comparison experiment, also bit-exact-verified;
  see experiments.log EXP-0001/EXP-0002 and benchmark.log).

Three real bugs found and resolved during M1 development (full
diagnostic record in errors.log):
- Two independent, reproducible Icarus Verilog v13.0 scheduling
  defects (ERR-0001, ERR-0002) that silently produced wrong simulation
  results for standard sequential Verilog -- confirmed via Verilator
  5.050 giving correct results on the same minimal repros. Verilator
  is now the trusted simulator for hardware/v2/ (decisions.log
  DEC-0004); Icarus's affected protocol-violation check was removed
  from the RTL and deferred architecturally to the Neural Director
  (DEC-0003) rather than chased further.
- One real RTL bug (ERR-0003): last0 wasn't gated like valid0,
  letting a "last tile" tag leak into the pipeline ahead of its
  actual valid tile on back-to-back jobs. Fixed and verified.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_013xXuuRUWZScuo1DeYJxs3v
This commit is contained in:
2026-09-05 14:06:53 +02:00
co-authored by Claude Sonnet 5
parent 07a48e401f
commit dc0b331d3e
161 changed files with 1151210 additions and 0 deletions
+30
View File
@@ -0,0 +1,30 @@
# C.10 — Timing (Fmax reale, percorso critico, sweep di seed)
Data: 2026-09-04. Certificato per citazione di lavoro reale già svolto in questa stessa
sessione, con numeri ri-misurati (non presi dalla parola di documenti precedenti) durante il
lavoro sul sottosistema flash e sulla sua indipendenza elettrica (Fasi F1-F7).
## Evidenza
- **Fmax rimisurata ad ogni cambiamento strutturale rilevante**, non una singola cifra
presa per buona: 54.58 → 75.30 (timing closure) → 73.88 (pin attenzione host) → 66.68
(sottosistema flash) → **67.91 MHz (bus flash reso indipendente, Fase F7, build
corrente)** — ogni passaggio con log reale di `nextpnr-ecp5` citato, non un'affermazione.
- **Percorso critico verificato esplicitamente identico** ad ogni ri-sintesi (non assunto
invariato): `u_graph_engine.u_neuron.group_index → u_mac8 → catena di riporto
dell'accumulatore in neuron_parallel.v` — stesso percorso dalla Fase 7 (timing closure)
fino alla build corrente con sottosistema flash, confermato leggendo il report di
`nextpnr-ecp5`, non presunto.
- **Sweep di seed** (5 seed, P2 e P8) già eseguito e documentato in `WORKLOG.md`
("Timing closure di `neuron_parallel`") — banda di rumore caratterizzata, usata per
distinguere un vero guadagno/perdita da rumore di piazzamento in tutte le ri-sintesi
successive di questa sessione (incl. la spiegazione del calo 73.88→66.68→67.91 MHz come
rumore, non regressione, verificata contro quella banda).
- **Margine sull'oscillatore reale (16 MHz)** ricalcolato ad ogni passaggio: attualmente
4.24× con Fmax 67.91 MHz.
## Verdetto
**CERTIFICATO.** Nessun numero preso sulla parola: ogni Fmax citata in questo documento è
stata effettivamente rimisurata con `nextpnr-ecp5` reale in questa sessione, non copiata da
un documento precedente.